[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887024":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},887024,573,1,"单选题","某炼油项目填海7hm2，配套建设成品油码头及罐区，并对航道进行疏浚。施工期海域评价专题的主要评价因子是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","成品油",false,{"key":16,"text":17,"correct":18},"B","悬浮物",true,{"key":20,"text":21,"correct":14},"C","重金属",{"key":23,"text":24,"correct":14},"D","溶解氧","施工期是航运码头工程产生生态破坏和环境污染的主要环节，重点考虑填充造陆工程、航道疏浚工程、护岸工程和码头施工对水域环境和生态系统的影响，说明施工工艺和施工布置方案的合理性，从施工全过程识别和估算影响源。运营期主要考虑陆域生活污水、运营过程中产生的含油污水、船舶污染物和码头、航道的风险事故。海运船舶污染物（船舶生活污水、含油污水、压载水、垃圾等）的处理处置有相应的法律规定。同时，应特别注意从装卸货物的理化性质及装卸工艺分析，识别可能产生的环境污染和风险事故。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]