[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887019":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887019,573,1,"单选题","分析污染型项目生产工艺过程中水染污物产生量时，应绘制物料平衡图、水平衡图以及（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","废水处理工艺流程图",false,{"key":16,"text":17,"correct":14},"B","项目总平面图",{"key":19,"text":20,"correct":14},"C","水环境功能区划图",{"key":22,"text":23,"correct":24},"D","生产工艺流程图",true,"编写验收监测报告时，重点应补充完善地理位置图、厂区平面图、工艺流程图、物料平衡图、水平衡图、污染治理工艺流程图、监测点位图。分析污染型项目生产工艺过程中水染污物产生量时，应绘制物料平衡图、水平衡图以及生产工艺流程图。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]