[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886973":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},886973,573,1,"单选题","II 类建设项目地下水环境影响评价时，减缓环境水文地质问题正确的措施是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","采用工程措施防治地下水污染",false,{"key":16,"text":17,"correct":18},"B","加强水资源联合调度控制地下水资源开发",true,{"key":20,"text":21,"correct":14},"C","加强包气带对污染物的阻隔和消减作用",{"key":23,"text":24,"correct":14},"D","制定不同区域的地面防渗方案","II类建设项目地下水保护与环境水文地质问题减缓措施之一:以均衡开采为原则，提出防止地下水资源超量开采的具体措施，以及控制资源开采过程中由于地下水水位变化诱发的温地退化、地面沉降、岩溶塌陷、地面裂缝等环境水文地质问题产生的具体措施。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]