[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886952":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},886952,573,1,"单选题","在建设项目环境风险评价中，识别重大危险源需根据功能单元的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","危险物质毒性",false,{"key":16,"text":17,"correct":18},"B","风险物质数量",true,{"key":20,"text":21,"correct":14},"C","c. 发生重大事故的概率",{"key":23,"text":24,"correct":14},"D","发生重大事故的可信度","对于某种或某类危险物质规定的数量，若功能羊元中物质数量等于或超过该数量，则该功能单元定为重大危险源。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]