[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886861":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},886861,573,1,"单选题","根据《环境影响评价公众参与暂行办法》，建设单位或者其委托的环境影响评价机构在进行公众参与时，采取调查公众意见、咨询专家意见、座谈会、论证会、听证会等形式，公开征求公众意见的时间应当在( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","第一次公示之前",false,{"key":16,"text":17,"correct":14},"B","第一次公示之后、第二次公示之前",{"key":19,"text":20,"correct":21},"C","第二次公示之后",true,{"key":23,"text":24,"correct":14},"D","什么时间都可以","建设单位或者其委托的环境影响坪价机构应当在发布信息公告、公开环境影响报告书的简本后(第二次公示之后)，采取调查公众意见、咨询专家意见、座谈会、论证会、听证会等形式，公开征求公众意见。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]