[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},886856,573,1,"单选题","建设项目竣工环境保护验收时，废气无组织排放的监测频次一般不得少于2d，每天 3次，每次( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","连续 1h 采样或在1h 内等时间间隔采样4个",true,{"key":16,"text":17,"correct":18},"B","连续 1h 采样",false,{"key":20,"text":21,"correct":18},"C","在lh 内等时间间隔采样4个",{"key":23,"text":24,"correct":18},"D","连续 2h 采样或在 2h 内等时间间隔采样8个","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]