[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886842":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},886842,573,1,"单选题","建设项目竣工环境保护验收时，对非稳定废水连续排放源，一般应采用加密的等时间采样和测试方法，一般以每日开工时间或 24h 为周期，采样不少于( )个周期。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","4","相同条件下，废气的采样周期与废水一样。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]