[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886830":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},886830,573,1,"单选题","验收调查报告的核心内容是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","环保措施落实情况的调查",false,{"key":16,"text":17,"correct":14},"B","补救对策措施和技资估算",{"key":19,"text":20,"correct":21},"C","环境影响调查与分析",true,{"key":23,"text":24,"correct":14},"D","施工期环境影响回顾","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]