[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886801":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},886801,573,1,"单选题","通过分析和预测一个或多个不确定性因素的变化所导致的项目可行性指标的变化幅度，判断该因素变化对项目可行性的影响程度，此种分析法是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","敏感分析法",true,{"key":16,"text":17,"correct":18},"B","环境价值法",false,{"key":20,"text":21,"correct":18},"C","c. 影子工程法",{"key":23,"text":24,"correct":18},"D","反向评估法","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]