[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886623":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},886623,573,1,"单选题","大气环境影响预测分析与评价时，需叠加现状背景值，分析项目建成后最终的区域环境质量状况，下列公式正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","新增污染源预测值+现状监测值一削减污染源计算值(如果有) +被取代污染源计算值(如果有) =项目建成后最终的环境影响",false,{"key":16,"text":17,"correct":18},"B","新增污染源预测值+现状监测值一削减污染源计算值(如果有)一被取代污染源计算值(如果有) =项目建成后最终的环境影响",true,{"key":20,"text":21,"correct":14},"C","新增污染源预测值十现状监测值=项目建成后最终的环境影响",{"key":23,"text":24,"correct":14},"D","新增污染源预测值十现状监测值+削减污染源计算值(如果有)一被取代污染源计算值(如果有) =项目建成后最终的环境影响","若评价范围内还有其他在建项目、己批复环境影响评价文件的拟建项目，也应考虑其建成后对评价范围的共同影响。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]