[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},886570,573,1,"单选题","对于评价范围内的在建和未建项目的大气污染源调查，可用( )确定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","物料衡算",false,{"key":16,"text":17,"correct":14},"B","类比调查",{"key":19,"text":20,"correct":21},"C","己批准的环境影响报告书中的资料",true,{"key":23,"text":24,"correct":14},"D","设计资料","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]