[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886472":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},886472,573,1,"单选题","",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主导风向，下风向",false,{"key":16,"text":17,"correct":18},"B","主导风向，上风向",true,{"key":20,"text":21,"correct":14},"C","东西向，下风向",{"key":23,"text":24,"correct":14},"D","东西向，上风向","一级评价至少8个方向上布点，二级评价至少4个方向上布点，三级坪价至少2个方向上布点。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]