[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},886401,573,1,"单选题","下列不属于建设项目选址要考虑内容的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","是否与规划相协调",false,{"key":16,"text":17,"correct":14},"B","是否影响敏感的环境保护目标",{"key":19,"text":20,"correct":14},"C","c. 是否违反法规要求",{"key":22,"text":23,"correct":24},"D","是否与当地的经济发展协调",true,"建设项目的选址、选线和规模，应从是否与规划相协调、是否违反法规要求、是否满足环境功能区要求、是否影响敏感的环境保护目标或造成重大资源经济和社会文化损失等方面进行环境合理性论证。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]