[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-572-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},572,"环境影响评价技术导则与标准","建筑工程",0,7,50,1090,[13,34,44,56,68,80,92,104,116,128,140,152,164,176,188,200,212,224,236,246,258,270,282,294,306,318,330,342,354,366,378,386,398,410,418,430,439,451,463,473,485,497,509,521,533,545,553,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},885602,1,"单选题","某厂生产周期为10h，按照《污水综合排放标准》，此污水监测频率为（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","每1h采样一次",false,{"key":24,"text":25,"correct":22},"B","每2h采样一次",{"key":27,"text":28,"correct":29},"C","每4h采样一次",true,{"key":31,"text":32,"correct":22},"D","24h不少于2次采样","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},885603,"根据《污水综合排放标准》，生产周期为20h的某工厂污水采样频率应为（ ）。",[38,39,40,42],{"key":20,"text":25,"correct":22},{"key":24,"text":28,"correct":29},{"key":27,"text":41,"correct":22},"每6h采样一次",{"key":31,"text":43,"correct":22},"每8h采样一次",{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":31,"analysis":33},885604,"根据《污水综合排放标准》，属于第一类污染物的是（ ）。",[48,50,52,54],{"key":20,"text":49,"correct":22},"总锰",{"key":24,"text":51,"correct":22},"总锌",{"key":27,"text":53,"correct":22},"总铜",{"key":31,"text":55,"correct":29},"总镍",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},885605,"根据《污水综合排放标准》，关于第二类污染物控制方式，说法正确的是（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"在车间排放口釆样监控",{"key":24,"text":63,"correct":29},"在排污单位排放口采样监控",{"key":27,"text":65,"correct":22},"在城镇排放口釆样监控",{"key":31,"text":67,"correct":22},"不同行业的采样监控位置不同",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":31,"analysis":33},885606,"根据《污水综合排放标准》（GB 8978—1996）的标准分级，下列叙述正确的是（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"排入GB3838中Ⅳ、Ⅴ类水域的污水执行三级标准",{"key":24,"text":75,"correct":22},"排入GB3838中Ⅲ类水域（划定的保护区和游泳区除外）的污水执行二级标准",{"key":27,"text":77,"correct":22},"排入GB3097中三类海域的污水执行三类标准",{"key":31,"text":79,"correct":29},"排入GB3097中二类海域的污水执行一类标准",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},885607,"以下企业污水排放不适用《污水综合排放标准》的是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"羽绒企业",{"key":24,"text":87,"correct":29},"黄磷企业",{"key":27,"text":89,"correct":22},"煤炭企业",{"key":31,"text":91,"correct":22},"啤酒企业",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},885608,"某项目地表水环境影响评价等级为二级，计划于两年后开始建设，污水拟排入附近的湖泊。根据《环境影响评价技术导则—地表水环境》，该湖泊水质现状调查时间至少应包括（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"丰水期和平水期",{"key":24,"text":99,"correct":22},"平水期和枯水期",{"key":27,"text":101,"correct":22},"丰水期和枯水期",{"key":31,"text":103,"correct":29},"枯水期",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},885609,"根据《环境影响评价技术导则—地表水环境》，下列河流可以简化为矩形平直河流的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"断面宽深比为10的中河",{"key":24,"text":111,"correct":22},"河段弯曲系数为1.5的中河",{"key":27,"text":113,"correct":22},"河段弯曲系数为1.8，断面宽深比为25的大河",{"key":31,"text":115,"correct":29},"河段弯曲系数为1.2，断面宽深比为25的大河",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},885610,"在一条河上进行水质调查，对于三级评价的小河，不论河水深浅，只在一条垂线上取一个样，一般情况下取样点应在水面下（ ）处，距河底不应小于（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"0.5m，0.5m",{"key":24,"text":123,"correct":29},"0.5m，0.3m",{"key":27,"text":125,"correct":22},"0.3m，0.5m",{"key":31,"text":127,"correct":22},"0.3m，0.3m",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":27,"analysis":33},885611,"根据《环境影响评价技术导则—地表水环境》，地面水环境影响评价分级判据中，应纳入污水排放量统计的是（ ）",[132,134,136,138],{"key":20,"text":133,"correct":22},"循环水排水",{"key":24,"text":135,"correct":22},"间接冷却水排水",{"key":27,"text":137,"correct":29},"含热量大的冷却水排水",{"key":31,"text":139,"correct":22},"含污染物极少的清净下水",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},885612,"某小河的断面宽深比为25，预测河段弯曲系数1.5。根据《环境影响评价技术导则—地表水环境》，该河流可简化为（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"矩形平直河流",{"key":24,"text":147,"correct":29},"矩形弯曲河流",{"key":27,"text":149,"correct":22},"非矩形河流",{"key":31,"text":151,"correct":22},"弯曲河流",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},885613,"根据《环境影响评价技术导则—地下水环境》，地下水现状调查与评价阶段的工作内容不包括（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"环境水文地质调查",{"key":24,"text":159,"correct":22},"地下水污染源调查",{"key":27,"text":161,"correct":22},"地下水环境现状监测",{"key":31,"text":163,"correct":29},"地下水环境评价范围确定",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},885614,"某建设项目地下水环境影响评价工作等级为一级，根据《环境影响评价技术导则—地下水环境》，该项目场地及其下游影响区的地下水水质监测点原则上不得少于（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"7个",{"key":24,"text":171,"correct":22},"5个",{"key":27,"text":173,"correct":29},"3个",{"key":31,"text":175,"correct":22},"2个",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},885615,"根据《环境影响评价技术导则—地下水环境》，下列情景组合中，应确定地下水污染防治分区为重点防渗区的是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"污染物为重金属＋天然包气带防污性能为“强”＋污染控制难易程度为“易”",{"key":24,"text":183,"correct":29},"污染物为重金属＋天然包气带防污性能为“中”＋污染控制难易程度为“难”",{"key":27,"text":185,"correct":22},"污染物为氨氮＋天然包气带防污性能为““弱””＋污染控制难易程度为“难”",{"key":31,"text":187,"correct":22},"污染物为氨氮＋天然包气带防污性能为“强”＋污染控制难易程度为“易”",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},885616,"根据《环境影响评价技术导则—地下水环境》，地下水环境影响评价工作等级为一级评价的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"线性工程项目",{"key":24,"text":195,"correct":22},"地下水环境影响行业分类为Ⅰ类的项目",{"key":27,"text":197,"correct":29},"地质条件较好的含水层储油等形式的地下储油库项目",{"key":31,"text":199,"correct":22},"位于热水、矿泉水、温泉水等特殊地下水资源保护区的项目",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},885617,"某新建项目地下水评价工作等级为二级，根据《环境影响评价技术导则—地下水环境》，符合地下水环境现状监测频率要求的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":29},"若有近3年内至少一个连续水文年的枯、丰水期水位、水质监测资料，不需补充监测",{"key":24,"text":207,"correct":22},"若有近3年内至少一个连续水文年的枯、丰水期水位、水质监测资料，应在评价期内至少进行一次地下水水位、水质监测",{"key":27,"text":209,"correct":22},"若有近3年内每年一次枯水期水位、水质监测资料，不需补充监测",{"key":31,"text":211,"correct":22},"若有近3年内每年一次丰水期水位、水质监测资料，不需补充监测",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},885618,"某建设项目地下水评价工作等级为一级，根据《环境影响评价技术导则—地下水环境》，地下水环境影响预测应采用的方法是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":29},"数值法",{"key":24,"text":219,"correct":22},"解析法",{"key":27,"text":221,"correct":22},"水量均衡法",{"key":31,"text":223,"correct":22},"类比分析法",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},885619,"根据《环境影响评价技术导则—地下水环境》，建设项目地下水评价工作等级为一级时，建设项目场地的环境水文地质调查精度至少应为（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"1∶5000",{"key":24,"text":231,"correct":29},"1∶10000",{"key":27,"text":233,"correct":22},"1∶50000",{"key":31,"text":235,"correct":22},"1∶100000",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},885620,"某Ⅰ类项目地下水评价工作等级为一级，评价区面积80km2，区内的潜水层和承压含水层为工业、农业提供水源，根据《环境影响评价技术导则—地下水环境》，地下水水质监测点应不少于（ ）。",[240,241,242,244],{"key":20,"text":171,"correct":22},{"key":24,"text":169,"correct":29},{"key":27,"text":243,"correct":22},"10个",{"key":31,"text":245,"correct":22},"14个",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},885621,"某建设项目位于规划的地下水集中式饮用水水源准保护区以外的补给径流区，根据《环境影响评价技术导则—地下水环境》，该项目地下水环境敏感程度为（ ）",[250,252,254,256],{"key":20,"text":251,"correct":22},"敏感",{"key":24,"text":253,"correct":29},"较敏感",{"key":27,"text":255,"correct":22},"不敏感",{"key":31,"text":257,"correct":22},"无法判定",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},885622,"某焦化项目位于地下热水资源较丰富的滨海区，根据《环境影响评价技术导则—地下水环境》，判定该项目的地下水环境影响评价工作等级为（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":29},"一级",{"key":24,"text":265,"correct":22},"二级",{"key":27,"text":267,"correct":22},"三级",{"key":31,"text":269,"correct":22},"判据不充分，无法判定",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},885623,"某建设项目地下水环境影响评价工作等级为二级，根据《环境影响评价技术导则—地下水环境》，该项目场地及其下游影响区的地下水水质监测点原则上不得少于（ ）个",[274,276,278,280],{"key":20,"text":275,"correct":29},"2",{"key":24,"text":277,"correct":22},"3",{"key":27,"text":279,"correct":22},"5",{"key":31,"text":281,"correct":22},"7",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},885624,"下列不属于地下水监测计划的内容是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"孔深",{"key":24,"text":289,"correct":22},"监测项目",{"key":27,"text":291,"correct":22},"监测频率",{"key":31,"text":293,"correct":29},"监测目的",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},885625,"地下水环境保护的管理体系包括（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"环境监测方案和向环境保护行政主管部门报告等制度",{"key":24,"text":301,"correct":22},"环境预测方案和向环境保护行政主管部门报告等制度",{"key":27,"text":303,"correct":29},"地下水环境跟踪监测方案和定期信息公开",{"key":31,"text":305,"correct":22},"环境评价方案和环境预测方案等制度",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},885626,"根据《环境影响评价技术导则—地下水环境》，关于重点防渗区防渗技术要求的说法，正确的是（ ）",[310,312,314,316],{"key":20,"text":311,"correct":29},"等效黏土防渗层厚度Mb≥6.0m，渗透系数K≤1.0×10－7cm\u002Fs",{"key":24,"text":313,"correct":22},"等效黏土防渗层厚度Mb≥3.0m，渗透系数K≤1.0×10－7cm\u002Fs",{"key":27,"text":315,"correct":22},"等效黏土防渗层厚度Mb≥1.5m，渗透系数K≤1.0×10－7cm\u002Fs",{"key":31,"text":317,"correct":22},"等效黏土防渗层厚度Mb≥1.0m，渗透系数K≤1.0×10－7cm\u002Fs",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},885627,"地下水环境影响预测属于地下水环境影响评价工作的（ ）阶段。",[322,324,326,328],{"key":20,"text":323,"correct":22},"准备阶段",{"key":24,"text":325,"correct":22},"现状调查与评价阶段",{"key":27,"text":327,"correct":29},"影响预测与评价阶段",{"key":31,"text":329,"correct":22},"结论阶段",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},885628,"根据《环境影响评价技术导则—地下水环境》，下列因素中，属于地下水污染影响评价工作等级分级表中等级划分依据的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"污水排放量",{"key":24,"text":337,"correct":22},"地下水水位",{"key":27,"text":339,"correct":22},"地下水埋藏条件",{"key":31,"text":341,"correct":29},"地下水环境敏感程度",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},885629,"根据《环境影响评价技术导则—地下水环境》，地下水污染防渗分区技术要求不需考虑的因素是（ ）",[346,348,350,352],{"key":20,"text":347,"correct":22},"污染物类型",{"key":24,"text":349,"correct":22},"污染控制难易程度",{"key":27,"text":351,"correct":29},"地下水埋深",{"key":31,"text":353,"correct":22},"天然包气带防污性能",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},885630,"根据《环境影响评价技术导则—地下水环境》，地下水环境现状调查与工程分析阶段主要工作内容不包括（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":29},"确定评价重点",{"key":24,"text":361,"correct":22},"现场勘探",{"key":27,"text":363,"correct":22},"室内资料分析",{"key":31,"text":365,"correct":22},"地下水监测",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},885631,"根据《环境影响评价技术导则—地下水环境》，关于地下水环境影响识别的说法，错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"地下水污染特征因子应根据建设项目液体物料成分等进行识别",{"key":24,"text":373,"correct":22},"地下水环境敏感程度应根据建设项目的地下水环境敏感特征进行识别",{"key":27,"text":375,"correct":29},"地下水环境影响应根据建设项目建设期和运营期两个阶段的工程特征进行识别",{"key":31,"text":377,"correct":22},"对于随着生产运行时间推移对地下水环境影响有可能加剧的建设项目，应按运营期的变化特征分为初期、中期和后期分别进行环境影响识别",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},885632,"某建设项目位于规划的地下水集中式饮用水水源准保护区，根据《环境影响评价技术导则—地下水环境》，判定该项目的地下水环境敏感程度为（ ）。",[382,383,384,385],{"key":20,"text":251,"correct":29},{"key":24,"text":253,"correct":22},{"key":27,"text":255,"correct":22},{"key":31,"text":269,"correct":22},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},885633,"根据《环境影响评价技术导则—地下水环境》，建设项目按其对地下水环境影响的程度分为（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"二类",{"key":24,"text":393,"correct":22},"三类",{"key":27,"text":395,"correct":29},"四类",{"key":31,"text":397,"correct":22},"五类",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},885634,"根据《环境影响评价技术导则—地下水环境》，地下水环境影响识别内容可不包括（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"可能造成地下水污染的装置和设施",{"key":24,"text":405,"correct":29},"评价区地下水污染特征及污染程度",{"key":27,"text":407,"correct":22},"建设项目可能导致地下水污染的特征因子",{"key":31,"text":409,"correct":22},"建设项目服务期满后可能的地下水污染途径",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},885635,"某地面以下的化学品输送管道项目，穿越一集中式应急引用水水源准保护区，根据《环境影响评价技术导则—地下水环境》，该项目的地下水环境影响评价工作等级判定为（ ）。",[414,415,416,417],{"key":20,"text":263,"correct":29},{"key":24,"text":265,"correct":22},{"key":27,"text":267,"correct":22},{"key":31,"text":257,"correct":22},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},885636,"根据《环境影响评价技术导则—地下水环境》，地下水环境影响预测的内容应给出（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"基本水质因子不同时段在包气带中的迁移规律",{"key":24,"text":425,"correct":22},"基本水质因子不同时段在地下水中的影响范围和程度",{"key":27,"text":427,"correct":22},"预测期内水文地质单元边界处特征因子随时间的变化规律",{"key":31,"text":429,"correct":29},"预测期内地下水环境保护目标处特征因子随时间的变化规律",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},885637,"某项目的地下水环境影响评价工作等级为一级，根据《环境影响评价技术导则—地下水环境》，该项目场地及其下游影响区的地下水水质监测点数量不得少于（ ）。",[434,436,437,438],{"key":20,"text":435,"correct":22},"1个",{"key":24,"text":173,"correct":29},{"key":27,"text":171,"correct":22},{"key":31,"text":169,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},885638,"根据《环境影响评价技术导则—地下水环境》，下列地下水评价工作等级为二级的建设项目中，应开展枯、丰二期地下水水位监测的有（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"位于沙漠分布区的建设项目",{"key":24,"text":446,"correct":22},"位于丘陵山区分布区的建设项目",{"key":27,"text":448,"correct":22},"位于岩溶裂隙分布区的建设项目",{"key":31,"text":450,"correct":29},"位于山前冲（洪）积分布区的建设项目",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},885639,"根据《环境影响评价技术导则—地下水环境》，建设项目应重点评价（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"地下水水位降低或升高诱发的环境水文地质问题的影响程度和范围",{"key":24,"text":458,"correct":22},"地下水水位降低或升高诱发的自然灾害问题",{"key":27,"text":460,"correct":22},"建设项目污染源对地面水环境保护目标的影响",{"key":31,"text":462,"correct":29},"建设项目污染源对地下水环境保护目标的影响",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},885640,"进行地下水环境预测时，二级评价中水文地质条件复杂时应采用（ ）。",[467,468,469,471],{"key":20,"text":217,"correct":29},{"key":24,"text":219,"correct":22},{"key":27,"text":470,"correct":22},"回归分析法",{"key":31,"text":472,"correct":22},"趋势外推法",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},885641,"污染源概化包括排放形式与（ ）的概化。",[477,479,481,483],{"key":20,"text":478,"correct":29},"排放规律",{"key":24,"text":480,"correct":22},"排放影响",{"key":27,"text":482,"correct":22},"排放功能",{"key":31,"text":484,"correct":22},"排放目标",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},885642,"根据《环境影响评价技术导则—地下水环境》，地下水环境影响识别应根据建设项目建设期、运营期和服务期满后三个阶段的工程特征，识别其（ ）的环境影响。",[489,491,493,495],{"key":20,"text":490,"correct":29},"正常与非正常两种状态下",{"key":24,"text":492,"correct":22},"正常与事故两种状态下",{"key":27,"text":494,"correct":22},"正常状态下",{"key":31,"text":496,"correct":22},"事故状态下",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},885643,"下列不属于地下水环境影响识别内容的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"识别可能造成地下水污染的装置和设施",{"key":24,"text":504,"correct":22},"识别建设项目在建设期、运营期、服务期满后可能的地下水污染途径",{"key":27,"text":506,"correct":22},"识别建设项目可能导致地下水污染的特征因子",{"key":31,"text":508,"correct":29},"水文、地质条件",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},885644,"建设项目地下水环境的二级评价范围为（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"大于20km2",{"key":24,"text":516,"correct":22},"小于6km2",{"key":27,"text":518,"correct":29},"6～20km2",{"key":31,"text":520,"correct":22},"20km2",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},885645,"根据《环境影响评价技术导则—地下水环境》，社区医疗、卫生院建设项目地下水环境影响评价的项目类别是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"Ⅰ类",{"key":24,"text":528,"correct":22},"Ⅱ类",{"key":27,"text":530,"correct":22},"Ⅲ类",{"key":31,"text":532,"correct":29},"Ⅳ类",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},885646,"根据《地下水质量标准》，使用多年水质分析资料进行地下水质量评价时，正确的评价量是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"多年几何平均值",{"key":24,"text":540,"correct":29},"多年算术平均值",{"key":27,"text":542,"correct":22},"多年丰水期几何平均值",{"key":31,"text":544,"correct":22},"多年平水期算术平均值",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},885647,"某地下水水样挥发性酚类（以苯酚计）检测浓度为0.001mg\u002FL，苯并芘浓度0.002μg\u002FL，根据《地下水质量标准》（标准值见下表），判定该地下水质量类别为（ ）",[549,550,551,552],{"key":20,"text":526,"correct":29},{"key":24,"text":528,"correct":22},{"key":27,"text":528,"correct":22},{"key":31,"text":532,"correct":22},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},885648,"某建设项目地下水环境影响评价工作等级为一级。根据《环境影响评价技术导则—地下水环境》，该项目调查评价区环境水文地质资料的调查精度应不低于（ ）比例尺。",[557,558,559,560],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":29},{"key":27,"text":235,"correct":22},{"key":31,"text":561,"correct":22},"1∶200000",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},885649,"根据《环境影响评价技术导则—地下水环境》，关于地下水影响评价范围的说法，错误的是（ ）",[566,568,570,572],{"key":20,"text":567,"correct":22},"线性工程应以工程边界两侧分别向外延伸200m作为调查评价范围",{"key":24,"text":569,"correct":22},"穿越饮用水源准保护区时，调查评价范围应至少包含水源保护区",{"key":27,"text":571,"correct":22},"地下水环境现状调查评价范围应包括与建设项目相关的重要地下水环境保护目标",{"key":31,"text":573,"correct":29},"地下水环境影响评价工作等级为一级的项目，地下水环境现状调查评价范围不小于50km2",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},885650,"根据《环境影响评价技术导则—地下水环境》，地下水环境影响评价范围（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"比环境影响预测范围小",{"key":24,"text":581,"correct":22},"比环境影响预测范围大",{"key":27,"text":583,"correct":22},"不小于环境影响预测范围",{"key":31,"text":585,"correct":29},"与环境影响预测范围相同",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},885651,"根据《环境影响评价技术导则—地下水环境》，关于地下水质量现状监测取样要求的说法，正确的有（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"建设项目为新建有色金属冶炼项目，且特征因子为六价铬时，应至少在含水层底部取一个样品",{"key":24,"text":593,"correct":22},"建设项目为改、扩建有色金属冶炼项目，且特征因子为六价铬时，应至少在含水层底部取一个样品",{"key":27,"text":595,"correct":22},"建设项目为新建项目，且特征因子为DNAPLs（重质非水相液体）时，应至少在含水层底部取一个样品",{"key":31,"text":597,"correct":29},"建设项目为改、扩建项目，且特征因子为DNAPLs（重质非水相液体）时，应至少在含水层底部取一个样品",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]