[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-572-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":484},{"id":5,"name":6,"category":7,"favorite":8},572,"环境影响评价技术导则与标准","建筑工程",0,22,50,1090,[13,34,48,61,73,85,97,109,121,133,146,159,172,184,196,208,220,233,244,256,269,281,292,304,316,328,336,344,352,360,372,385,393,405,417,429,440,453,462,473],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":32,"analysis":33},886358,2,"多选题","下列物质中可以不作为固体废物管理的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","用于实验室化验分析的固体废物样品",true,{"key":24,"text":25,"correct":22},"B","经过修复和加工后用于其原始用途的物质",{"key":27,"text":28,"correct":22},"C","修复后作为土壤用途使用的污染土壤",{"key":30,"text":31,"correct":22},"D","在现场直接返回到原生产过程的物质","ABCD","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":47,"analysis":33},886359,"在对危险废物填埋场场址进行环境影响评价时，应重点考虑的因素有（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"危险废物填埋场渗滤液可能产生的风险",{"key":24,"text":41,"correct":22},"填埋场结构",{"key":27,"text":43,"correct":22},"防渗层长期安全性及其由此造成的渗漏风险",{"key":30,"text":45,"correct":46},"填埋场的位置",false,"ABC",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":33},886360,"下列废物可以直接进入生活垃圾填埋场填埋处置的是（ ）。",[52,54,56,58],{"key":20,"text":53,"correct":46},"电子废物",{"key":24,"text":55,"correct":22},"企事业单位产生的办公废物",{"key":27,"text":57,"correct":46},"医疗废物焚烧残渣（包括飞灰、底渣）",{"key":30,"text":59,"correct":22},"含水率小于30%，二噁英含量低于3μgTEQ\u002Fkg的生活垃圾焚烧飞灰","BD",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":32,"analysis":33},886361,"危险废物产生量核算方法有（ ）。",[65,67,69,71],{"key":20,"text":66,"correct":22},"物料衡算法",{"key":24,"text":68,"correct":22},"类比法",{"key":27,"text":70,"correct":22},"实测法",{"key":30,"text":72,"correct":22},"产排污系数法",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":32,"analysis":33},886362,"对危险废物环境影响进行工程分析时，应全面分析各类固体废物的（ ）。",[77,79,81,83],{"key":20,"text":78,"correct":22},"产生环节",{"key":24,"text":80,"correct":22},"主要成分",{"key":27,"text":82,"correct":22},"理化性质",{"key":30,"text":84,"correct":22},"有害成分",{"id":86,"libraryId":5,"type":15,"typeLabel":16,"stem":87,"options":88,"answer":47,"analysis":33},886363,"下列哪些污染物属于Ⅱ类一般工业固体废物？（ ）",[89,91,93,95],{"key":20,"text":90,"correct":22},"按照《固体废物浸出毒性浸出方法》规定的方法进行浸出试验而获得的浸出液pH小于6",{"key":24,"text":92,"correct":22},"按照《固体废物浸出毒性浸出方法》规定的方法进行浸出试验而获得的浸出液pH大于9",{"key":27,"text":94,"correct":22},"按照《固体废物浸出毒性浸出方法》规定的方法进行浸出试验而获得的浸出液中有一种或一种以上的污染物浓度超过《污水综合排放标准》",{"key":30,"text":96,"correct":46},"按照《固体废物浸出毒性浸出方法》规定的方法进行浸出试验而获得的浸出液中任何一种污染物的浓度均未超过《污水综合排放标准》，且pH在6～9",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":32,"analysis":33},886364,"《建设项目竣工环境保护验收技术规范—生态影响类》适用于下列（ ）行业。",[101,103,105,107],{"key":20,"text":102,"correct":22},"管道运输",{"key":24,"text":104,"correct":22},"牧业",{"key":27,"text":106,"correct":22},"海岸带开发",{"key":30,"text":108,"correct":22},"区域、流域开发",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":32,"analysis":33},886365,"下列建设项目中，其竣工环保验收适用《建设项目竣工环境保护验收技术规范—生态影响类》的有（ ）。",[113,115,117,119],{"key":20,"text":114,"correct":22},"风力发电",{"key":24,"text":116,"correct":22},"海洋开发",{"key":27,"text":118,"correct":22},"流域开发",{"key":30,"text":120,"correct":22},"高压输变电工程",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":32,"analysis":33},886366,"对于（ ）项目，验收调查应在工况稳定、生产负荷达到近期预测生产能力（或交通量）75%以上的情况下进行。",[125,127,129,131],{"key":20,"text":126,"correct":22},"公路",{"key":24,"text":128,"correct":22},"铁路",{"key":27,"text":130,"correct":22},"轨道交通",{"key":30,"text":132,"correct":22},"港口",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":145,"analysis":33},886367,"《建设项目竣工环境保护验收技术规范—生态影响类》规定的验收调查标准的确定原则有（ ）。",[137,139,141,143],{"key":20,"text":138,"correct":22},"环境影响评价文件中有明确规定的，按其规定作为验收标准",{"key":24,"text":140,"correct":46},"现阶段暂时还没有环境保护标准的，可调查类似的项目，用类比结果作为验收标准",{"key":27,"text":142,"correct":46},"现阶段暂时还没有环境保护标准的，可用物料衡算、热量平衡等数学计算的结果作为验收标准",{"key":30,"text":144,"correct":22},"现阶段暂时还没有环境保护标准的，可按实际调查情况给出结果","AD",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":158,"analysis":33},886368,"环境敏感目标调查，应调查其（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"规模",{"key":24,"text":153,"correct":22},"地理位置",{"key":27,"text":155,"correct":46},"所属管辖行政区",{"key":30,"text":157,"correct":22},"所处环境功能区及保护内容","ABD",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":171,"analysis":33},886369,"在采取环境保护措施时，应概括描述工程在（ ）对生态、污染和社会影响的。",[163,165,167,169],{"key":20,"text":164,"correct":46},"准备阶段",{"key":24,"text":166,"correct":22},"设计阶段",{"key":27,"text":168,"correct":22},"施工阶段",{"key":30,"text":170,"correct":22},"运行阶段","BCD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":32,"analysis":33},886370,"下列（ ）属于生态影响的环境保护措施。",[176,178,180,182],{"key":20,"text":177,"correct":22},"生态用水泄水建筑物及运行方案",{"key":24,"text":179,"correct":22},"低温水缓解工程措施",{"key":27,"text":181,"correct":22},"土壤质量保护和占地恢复措施",{"key":30,"text":183,"correct":22},"生态监测措施",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":32,"analysis":33},886371,"根据建设项目的特点设置生态影响调查内容，一般包括（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":22},"工程沿线生态状况",{"key":24,"text":191,"correct":22},"工程占地情况调查",{"key":27,"text":193,"correct":22},"工程影响区域内植被情况和水土流失情况调查",{"key":30,"text":195,"correct":22},"工程影响区域内生态敏感目标和人文景观的调查",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":60,"analysis":33},886372,"根据生态影响的调查和分析的结果，客观、明确地从技术角度论证工程是否符合建设项目竣工环境保护验收条件，主要包括（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":46},"不能通过竣工环境保护验收",{"key":24,"text":203,"correct":22},"建议通过竣工环境保护验收",{"key":27,"text":205,"correct":46},"处罚后，建议通过竣工环境保护验收",{"key":30,"text":207,"correct":22},"限期整改后，建议通过竣工环境保护验收",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":32,"analysis":33},886373,"某城市轨道交通工程影响区域内，有一文物保护建筑，根据《建设项目竣工环境保护验收技术规范—生态影响类》，应列入验收调查内容的有（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"该建筑与城市交通工程间的相对位置关系",{"key":24,"text":215,"correct":22},"该建筑的保护级别及保护范围",{"key":27,"text":217,"correct":22},"该建筑的建设年代",{"key":30,"text":219,"correct":22},"该建筑的振动保护要求",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":232,"analysis":33},886374,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，水库建设项目验收时，应调查的社会影响环境保护措施有（ ）",[224,226,228,230],{"key":20,"text":225,"correct":22},"移民安置措施",{"key":24,"text":227,"correct":22},"库区文物保护措施",{"key":27,"text":229,"correct":46},"鱼类增殖放流措施",{"key":30,"text":231,"correct":46},"水土保持措施","AB",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":47,"analysis":33},886375,"依据《建设项目竣工环境保护验收技术规范—生态影响类》，某铁矿项目竣工环境保护验收调查中，其工程概况调查内容包括（ ）。",[237,238,240,242],{"key":20,"text":153,"correct":22},{"key":24,"text":239,"correct":22},"项目组成",{"key":27,"text":241,"correct":22},"项目工程量",{"key":30,"text":243,"correct":46},"项目立项时间和审批部门",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":158,"analysis":33},886376,"公众意见调查在公众知情的情况下开展，可采用（ ）等方法。",[248,250,252,254],{"key":20,"text":249,"correct":22},"问卷调查",{"key":24,"text":251,"correct":22},"座谈会",{"key":27,"text":253,"correct":46},"发布会",{"key":30,"text":255,"correct":22},"媒体公示",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":268,"analysis":33},886377,"生态影响调查结论是全部调查工作的结论，编写时重点概括说明（ ），在此基础上，对环境保护措施提出改进措施和建议。",[260,262,264,266],{"key":20,"text":261,"correct":22},"工程建设成后产生的主要环境问题",{"key":24,"text":263,"correct":46},"工程建设前后的主要环境问题",{"key":27,"text":265,"correct":22},"现有环境保护措施的有效性",{"key":30,"text":267,"correct":46},"公众调查的意见","AC",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":32,"analysis":33},886378,"下列属于生态影响型项目竣工环境保护验收调查的内容是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"环境敏感目标调查",{"key":24,"text":276,"correct":22},"工程调查",{"key":27,"text":278,"correct":22},"环境保护措施落实情况调查",{"key":30,"text":280,"correct":22},"生态影响调查",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":268,"analysis":33},886379,"下列建设项目中，适用《建设项目竣工环境保护验收技术规范—生态影响类》的有（ ）。",[285,287,289,290],{"key":20,"text":286,"correct":22},"水利水电",{"key":24,"text":288,"correct":46},"汽车制造",{"key":27,"text":130,"correct":22},{"key":30,"text":291,"correct":46},"电解铝",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":232,"analysis":33},886380,"某公路项目涉及自然保护区。根据《建设项目竣工环境保护验收技术规范—生态影响类》，该项目“生态影响调查”的内容有（ ）",[296,298,300,302],{"key":20,"text":297,"correct":22},"自然保护区的保护级别及保护对象",{"key":24,"text":299,"correct":22},"工程临时占地的生态恢复情况",{"key":27,"text":301,"correct":46},"施工期固体废物的处置方式",{"key":30,"text":303,"correct":46},"风险事故防范及应急措施落实情况",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":32,"analysis":33},886381,"生态影响型项目竣工验收调查重点有（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"环境质量和主要污染因子达标情况",{"key":24,"text":311,"correct":22},"环境敏感目标基本情况及变更情况",{"key":27,"text":313,"correct":22},"工程环境保护投资情况",{"key":30,"text":315,"correct":22},"工程施工期和试运行期实际存在的及公众反映强烈的环境问题",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":32,"analysis":33},886382,"生态影响型项目竣工环境保护验收调查程序可分为准备、（ ）等阶段。",[320,322,324,326],{"key":20,"text":321,"correct":22},"初步调查",{"key":24,"text":323,"correct":22},"编制实施方案",{"key":27,"text":325,"correct":22},"详细调查",{"key":30,"text":327,"correct":22},"编制调查报告",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":268,"analysis":33},886383,"下列建设项目中，适用《建设项目竣工环境保护验收技术规范 生态影响类》的有（ ）。",[332,333,334,335],{"key":20,"text":286,"correct":22},{"key":24,"text":288,"correct":46},{"key":27,"text":130,"correct":22},{"key":30,"text":291,"correct":46},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":32,"analysis":33},886384,"下列建设项目中，其竣工环保验收适用《建设项目竣工环境保护验收技术规范一生态影响类》的有（ ）。",[340,341,342,343],{"key":20,"text":114,"correct":22},{"key":24,"text":116,"correct":22},{"key":27,"text":118,"correct":22},{"key":30,"text":120,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":232,"analysis":33},886385,"某公路项目涉及自然保护区。根据《建设项目竣工环境保护验收技术规范 生态影响类》，该项目“生态影响调查”的内容有（ ）。",[348,349,350,351],{"key":20,"text":297,"correct":22},{"key":24,"text":299,"correct":22},{"key":27,"text":301,"correct":46},{"key":30,"text":303,"correct":46},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":32,"analysis":33},886386,"某城市轨道交通工程影响区域内，有一文物保护建筑，根据《建设项目竣工环境保护验收技术规范 生态影响类》，应列入验收调查内容的有（ ）。",[356,357,358,359],{"key":20,"text":213,"correct":22},{"key":24,"text":215,"correct":22},{"key":27,"text":217,"correct":22},{"key":30,"text":219,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":268,"analysis":33},886387,"根据《建设项目竣工环境保护验收技术规范生态影响类》，关于验收调查运行工况要求的说法，正确的有 ( )。",[364,366,368,370],{"key":20,"text":365,"correct":22},"输变电工程正常运行情况下即可开展竣工环境保护验收调查",{"key":24,"text":367,"correct":46},"分期建设、分期投入生产的水利项目应在全部工程内容建成后开展竣工环境保护验收调查",{"key":27,"text":369,"correct":22},"港口项目竣工环境保护验收调查应在工况稳定、生产负荷达到近期预测生产能力75%以上的情况下进行",{"key":30,"text":371,"correct":46},"轨道交通项目运力达不到设计能力75%以上时，可通过调整工况达到设计能力75%以上再进行竣工环境保护验收调查",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":384,"analysis":33},886388,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，下列措施中，纳入社会影响环境保护措施落实情况调查内容的有（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":46},"农田保护和占地恢复措施",{"key":24,"text":379,"correct":22},"移民安置所采取的保护措施",{"key":27,"text":381,"correct":22},"文物保护所采取的保护措施",{"key":30,"text":383,"correct":46},"风景名胜区保护所采取的措施","BC",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":232,"analysis":33},886389,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，水库建设项目验收时，应调查的社会影响环境保护措施有（ ）。",[389,390,391,392],{"key":20,"text":225,"correct":22},{"key":24,"text":227,"correct":22},{"key":27,"text":229,"correct":46},{"key":30,"text":231,"correct":46},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":47,"analysis":33},886390,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，某高速公路采取的下列措施中，属于环境保护措施的有（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"边坡防护工程",{"key":24,"text":400,"correct":22},"野生动物通道",{"key":27,"text":402,"correct":22},"取弃土场平整绿化",{"key":30,"text":404,"correct":46},"服务区人工景观工程",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":171,"analysis":33},886391,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，关于验收调查标准，说法正确的有（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":46},"对已修订新颁布的环境保护标准，按新标准进行验收",{"key":24,"text":412,"correct":22},"现阶段暂时还没有环境保护标准的可按实际调查情况给出结果",{"key":27,"text":414,"correct":22},"环境影响评价文件和环境影响评价审批文件中有明确规定的，按其规定作为验收标准",{"key":30,"text":416,"correct":22},"原则上采用环评阶段经环境保护部门确认的环境保护标准与环境保护设施工艺指标进行验收",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":47,"analysis":33},886392,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，关于水土流失影响调查结果，说法正确的有（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"列表说明工程土石方调运情况",{"key":24,"text":424,"correct":22},"调查工程对影响区域内水利设施的影响",{"key":27,"text":426,"correct":22},"调查工程施工弃渣造成的水土流失量",{"key":30,"text":428,"correct":46},"若建设项目水土保持验收工作已结束，可直接引用其验收结果",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":171,"analysis":33},886393,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，对水库建设项目，验收时应调查的生态影响环境保护措施有（ ）。",[433,435,437,438],{"key":20,"text":434,"correct":46},"移民安置工程",{"key":24,"text":436,"correct":22},"低温水缓解工程",{"key":27,"text":177,"correct":22},{"key":30,"text":439,"correct":22},"生态监测",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":452,"analysis":33},886394,"工程调查的内容包括（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"提供适当比例的工程地理位置图和工程平面图",{"key":24,"text":447,"correct":46},"工程效果图",{"key":27,"text":449,"correct":22},"工程建设过程",{"key":30,"text":451,"correct":22},"工程概况","ACD",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":268,"analysis":33},886395,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，关于验收调查运行工况要求的说法，正确的有（ ）。",[457,459,460,461],{"key":20,"text":458,"correct":22},"输变电工程正常运行情况下可开展竣工环境保护验收调查",{"key":24,"text":367,"correct":46},{"key":27,"text":369,"correct":22},{"key":30,"text":371,"correct":46},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":47,"analysis":33},886396,"生态影响型项目生态影响调查方法有（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"文件资料调查",{"key":24,"text":469,"correct":22},"现场勘察",{"key":27,"text":471,"correct":22},"公众意见调查",{"key":30,"text":68,"correct":46},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":32,"analysis":33},886397,"验收调查应重点调查的内容是（ ）。",[477,479,481,482],{"key":20,"text":478,"correct":22},"环境敏感目标基本情况",{"key":24,"text":480,"correct":22},"环境影响评价制度执行情况",{"key":27,"text":309,"correct":22},{"key":30,"text":483,"correct":22},"环境保护应急措施落实情况",[485,489,492,495,498,501],{"id":486,"name":487,"category":7,"favorite":488},1,"领导干部任职前廉政法规知识测试题",92,{"id":490,"name":491,"category":7,"favorite":486},595,"建筑结构与设备",{"id":493,"name":494,"category":7,"favorite":486},715,"招标采购专业知识与法律法规",{"id":496,"name":497,"category":7,"favorite":486},848,"市政方向-通用基础",{"id":499,"name":500,"category":7,"favorite":8},534,"BIM工程师",{"id":502,"name":500,"category":7,"favorite":8},535]