[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-572-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},572,"环境影响评价技术导则与标准","建筑工程",0,2,50,1090,[13,34,45,57,69,81,93,105,117,129,141,153,161,173,185,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},885347,1,"单选题","根据《建设项目环境影响评价技术导则总纲》，对以生态影响为主的建设项目，环境监测计划应提出（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","环境监理要求",false,{"key":24,"text":25,"correct":26},"B","生态监测方案",true,{"key":28,"text":29,"correct":22},"C","环境跟踪监测计划",{"key":31,"text":32,"correct":22},"D","定期跟踪监测方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},885348,"根据《建设项目环境影响评价技术导则总纲》，对存在较大潜在人群健康风险的建设项目，环境监测计划应提出（）。",[38,40,42,43],{"key":20,"text":39,"correct":22},"剂量一效应评价要求",{"key":24,"text":41,"correct":22},"毒理监测方案",{"key":28,"text":29,"correct":26},{"key":31,"text":44,"correct":22},"健康监测方案",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":28,"analysis":33},885349,"（2018年）根据《建设项目环境影响评价技术导则总纲》，下列情景中，属于建设项目生产运行阶段重点预测的情景是（）。",[49,51,53,55],{"key":20,"text":50,"correct":22},"非正常工况和事故工况",{"key":24,"text":52,"correct":22},"正常工况和事故工况",{"key":28,"text":54,"correct":26},"正常工况和非正常工况",{"key":31,"text":56,"correct":22},"正常工况.非正常工况和事故工况",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":31,"analysis":33},885350,"（2018年）根据《建设项目环境影响评价技术导则总纲》，建设项目环境保护措施的可行性验证内容不包括（）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"拟采取措施的长期稳定运行和达标排放的可靠性",{"key":24,"text":64,"correct":22},"拟采取措施的技术可行性和经济合理性",{"key":28,"text":66,"correct":22},"生态保护和恢复效果的可达性",{"key":31,"text":68,"correct":26},"拟采取措施的清洁生产水平",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":20,"analysis":33},885351,"（2018年）根据《建设项目环境影响评价技术导则总纲》，建设项目的环境影响因素分析内容不包括（）。",[73,75,77,79],{"key":20,"text":74,"correct":26},"区域环境特征",{"key":24,"text":76,"correct":22},"工艺环境友好性",{"key":28,"text":78,"correct":22},"工艺过程主要产污节点",{"key":31,"text":80,"correct":22},"末端治理措施协同性",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":33},885352,"（2018年）根据《建设项目环境影响评价技术导则总纲》，环境影响评价工作等级划分依据不包括（）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"建设项目特点",{"key":24,"text":88,"correct":22},"相关法律法规",{"key":28,"text":90,"correct":26},"项目建设周期",{"key":31,"text":92,"correct":22},"环境功能区划",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},885353,"（2017年）根据《建设项目环境影响评价技术导则总纲》，下列工作内容中，不属于分析论证和预测评价阶段工作内容的是（）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"工程分析",{"key":24,"text":100,"correct":22},"环境现状监测",{"key":28,"text":102,"correct":22},"环境影响预测",{"key":31,"text":104,"correct":26},"评价工作等级确定",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},885354,"（2017年）根据《建设项目环境影响评价技术导则总纲》，环境影响评价因子筛选可不考虑（）。",[109,111,113,115],{"key":20,"text":110,"correct":26},"评价工作等级",{"key":24,"text":112,"correct":22},"环境保护目标",{"key":28,"text":114,"correct":22},"环境制约因素",{"key":31,"text":116,"correct":22},"评价标准",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},885355,"（2017年）根据《建设项目环境影响评价技术导则总纲》，环境现状调查与评价内容不包括（）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"区域污染源调查",{"key":24,"text":124,"correct":22},"环境保护目标调查",{"key":28,"text":126,"correct":26},"社会环境现状调查与评价",{"key":31,"text":128,"correct":22},"自然环境现状调查与评价",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},885356,"（2017年）《建设项目环境影响评价技术导则总纲》规定的环境影响评价原则不包括（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"依法评价",{"key":24,"text":136,"correct":26},"早期介入",{"key":28,"text":138,"correct":22},"科学评价",{"key":31,"text":140,"correct":22},"突出重点",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},885357,"环境影响因素识别应对建设项目对各环境要素可能产生的污染影响与生态影响进行（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"定量分析",{"key":24,"text":148,"correct":26},"定性分析",{"key":28,"text":150,"correct":22},"定量分析与定性分析",{"key":31,"text":152,"correct":22},"数据分析",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":28,"analysis":33},885358,"根据《建设项目环境影响评价技术导则—总纲》，环境现状调查与评价内容不包括（ ）。",[157,158,159,160],{"key":20,"text":122,"correct":22},{"key":24,"text":124,"correct":22},{"key":28,"text":126,"correct":26},{"key":31,"text":128,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},885359,"某项目以烟尘排放为特点，大气环境影响评价工作等级为二级。根据《环境影响评价技术导则—大气环境》，该项目PM10影响预测的内容有（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":26},"运行期环境空气保护目标的PM10日平均浓度",{"key":24,"text":168,"correct":22},"运行期环境空气保护目标的PM10小时平均浓度",{"key":28,"text":170,"correct":22},"施工期环境空气保护目标的PM10日平均浓度",{"key":31,"text":172,"correct":22},"施工期环境空气保护目标的PM10小时平均浓度",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},885360,"根据《环境影响评价技术导则—大气环境》，对于大气环境影响评价等级为二级，评价范围边长为60km的山区复杂地形区建设项目，大气环境影响预测可选用的模式有（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"估算模式",{"key":24,"text":180,"correct":22},"AERMOD模式",{"key":28,"text":182,"correct":22},"ADMS模式",{"key":31,"text":184,"correct":26},"CALPUFF模式",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},885361,"根据《环境影响评价技术导则—大气环境》，关于预测因子选择的说法，正确的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":26},"根据评价因子确定预测因子",{"key":24,"text":192,"correct":22},"根据评价等级确定预测因子",{"key":28,"text":194,"correct":22},"根据评价范围确定预测因子",{"key":31,"text":196,"correct":22},"根据预测模型确定预测因子",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},885362,"某项目有两个大气排放源，经估算模式计算两个排放源排放的污染物最大地面浓度占标率（Pmax）分别为10%和85%，地面浓度占标率10%处（D10&）距两个排放源最远距离分别为2.0km和4.8km。根据《环境影响评价技术导则—大气环境》，该项目的评价等级和评价范围边长分别为（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":26},"一级，9.6km",{"key":24,"text":204,"correct":22},"二级，9.6km",{"key":28,"text":206,"correct":22},"一级，5km",{"key":31,"text":208,"correct":22},"二级，5km",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},885363,"大气污染源排放的污染物按存在形态分为（ ）污染物。",[213,215,217,219],{"key":20,"text":214,"correct":22},"颗粒物和固态",{"key":24,"text":216,"correct":26},"颗粒物和气态",{"key":28,"text":218,"correct":22},"固态和气态",{"key":31,"text":220,"correct":22},"颗粒物和悬浮",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},885364,"环境空气质量功能区分为（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":26},"二类",{"key":24,"text":228,"correct":22},"3类",{"key":28,"text":230,"correct":22},"Ⅲ级",{"key":31,"text":232,"correct":22},"3级",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},885365,"根据《环境影响评价技术导则—大气环境》，如果符合可直接使用的气象台（站）有高空探空资料，对于大气环境一、二级评价项目，可酌情调查有关距该气象台（站）地面（ ）高度以下的风和气温资料。",[237,239,241,243],{"key":20,"text":238,"correct":22},"1200m",{"key":24,"text":240,"correct":26},"1500m",{"key":28,"text":242,"correct":22},"1700m",{"key":31,"text":244,"correct":22},"2000m",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":28,"analysis":33},885366,"建设项目的大气环境影响评价范围，一般可取建设项目的（ ）为评价区的中心，主导风向为主轴的方形或矩形。",[249,251,253,255],{"key":20,"text":250,"correct":22},"厂地的中心",{"key":24,"text":252,"correct":22},"厂界",{"key":28,"text":254,"correct":26},"主要污染源",{"key":31,"text":256,"correct":22},"高度最高的点源",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},885367,"对于以线源为主的城市道路等项目，评价范围设定为（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"线源中心两侧各200m",{"key":24,"text":264,"correct":22},"线源中心两侧各100m",{"key":28,"text":266,"correct":22},"面源中心两侧各200m",{"key":31,"text":268,"correct":22},"点源中心两侧各200m",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},885368,"关于评价工作等级的说法中，正确的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"对于高耗能行业的多源项目，评价等级应不低于三级",{"key":24,"text":276,"correct":26},"对生态环境有严重危害的特殊项目，评价等级一般不低于二级",{"key":28,"text":278,"correct":22},"对于以城市快速路、主干路为主的新建、扩建项目，评价等级不低于一级",{"key":31,"text":280,"correct":22},"对于建成后污染物排放总量减少的改、扩建项目，评价等级可低于二级",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},885369,"某项目大气环境影响评价等级为一级，距项目最近的地面气象观测站和高空气象探测站分别为38km和55km。下列气象观测资料调查中，符合《环境影响评价技术导则—大气环境》要求的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"调查距项目最近的地面气象观测站近5年内至少连续3年的常规地面气象观测资料",{"key":24,"text":288,"correct":22},"调查距项目最近的地面气象观测站近3年内至少连续1年的常规地面气象观测资料",{"key":28,"text":290,"correct":22},"调查距项目最近的高空气象探测站近5年内至少连续3年的常规高空气象探测资料",{"key":31,"text":292,"correct":22},"调查距项目最近的高空气象探测站近3年内至少连续1年的常规高空气象探测资料",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},885370,"根据《环境影响评价技术导则—大气环境》，（ ）不属于常规高空气象探测资料调查内容。",[297,299,301,303],{"key":20,"text":298,"correct":22},"探空层数数据",{"key":24,"text":300,"correct":22},"探空层每层高度",{"key":28,"text":302,"correct":26},"总云量、低云量",{"key":31,"text":304,"correct":22},"探空层每层的露点温度",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},885371,"基于估算模式计算某企业的大气环境防护距离时，甲污染物计算的距离为205m，乙污染物计算的距离为300m，丙污染物计算的距离为350m，则该企业的大气环境防护距离应取（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"400m",{"key":24,"text":312,"correct":22},"500m",{"key":28,"text":314,"correct":26},"350m",{"key":31,"text":316,"correct":22},"325m",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},885372,"大气环境预测因子应根据评价因子而定，选取有（ ）的评价因子作为预测因子。",[321,323,325,327],{"key":20,"text":322,"correct":22},"国家环境空气质量标准",{"key":24,"text":324,"correct":22},"国家环境空气排放标准",{"key":28,"text":326,"correct":26},"环境空气质量标准",{"key":31,"text":328,"correct":22},"地方环境空气质量标准",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},885373,"根据《环境影响评价技术导则—大气环境》，（ ）属于大气环境影响预测的步骤。",[333,335,337,339],{"key":20,"text":334,"correct":22},"确定评价等级",{"key":24,"text":336,"correct":22},"确定评价范围",{"key":28,"text":338,"correct":26},"确定气象条件",{"key":31,"text":340,"correct":22},"确定面源排放温度",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},885374,"等标排放量Pi在大气环境影响工作等级判断中是主要依据之一，在其计算中需参照的大气环境质量标准，C0i一般选用的是GB 3095中（ ）级标准的一次采样浓度允许值。",[345,347,349,351],{"key":20,"text":346,"correct":22},"一",{"key":24,"text":348,"correct":26},"二",{"key":28,"text":350,"correct":22},"三",{"key":31,"text":352,"correct":22},"四",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},885375,"某种经筛选后选定的污染因子在A地的浓度预测值为0.15mg\u002Fm3，对应的质量标准值是0.30mg\u002Fm3，则其评价指数为（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"0.5",{"key":24,"text":360,"correct":22},"0.6",{"key":28,"text":362,"correct":22},"0.8",{"key":31,"text":364,"correct":22},"2",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},885376,"一级评价项目的大气质量现状监测，每期监测时间至少应取得有季节代表性的（ ）的有效数据。",[369,371,373,375],{"key":20,"text":370,"correct":22},"4天",{"key":24,"text":372,"correct":22},"5天",{"key":28,"text":374,"correct":22},"6天",{"key":31,"text":376,"correct":26},"7天",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},885377,"根据《环境影响评价技术导则—大气环境》，城市道路项目大气环境质量现状监测点布设原则是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"至少设6个监测点",{"key":24,"text":384,"correct":22},"只设4个监测点",{"key":28,"text":386,"correct":22},"监测点数目根据当地城市环境空气例行监测点的分布情况而定",{"key":31,"text":388,"correct":26},"监测点数目根据道路布局、车流量、环境敏感点分布情况而定",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},885378,"对于大气一级评价项目，按大气环境影响评价技术导则规定，其现状监测不得少于二期，其监测季节分别为（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"夏季、冬季",{"key":24,"text":396,"correct":22},"夏季、秋季",{"key":28,"text":398,"correct":22},"春季、夏季",{"key":31,"text":400,"correct":22},"春季、秋季",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},885379,"根据《环境影响评价技术导则—大气环境》，污染源调查的基本内容包括：①按生产工艺流程或按分厂、车间分别绘制污染流程图；②按分厂或车间逐一统计各有组织排放源和无组织排放源的主要污染物排放量；③对改扩建项目的主要污染物排放量应给出现有工程排放量、新扩建工程排放量，以及预计现有工程经改造后污染物的削减量，并按上述三个量计算最终排放量；④对于毒性较大的物质还应估计其非正常排放量；⑤污染物排放方式；⑥点源调查统计；⑦面源调查统计；⑧对于颗粒物污染源，还应调查其密度及粒径分布；⑨原料、固体废弃物等堆放场所产生的扬尘可按面源处理。对一级项目，需要进行的调查项目包括以上的（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"①～⑧",{"key":24,"text":408,"correct":22},"①、②、⑤、⑥、⑦、⑧",{"key":28,"text":410,"correct":26},"①～⑨",{"key":31,"text":412,"correct":22},"①、②、③、④、⑥、⑦、⑨",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},885380,"根据《环境影响评价技术导则—大气环境》，大气环境影响评价中，经过对建设项目的初步工程分析，选择（ ）种主要污染物，计算其等标排放量",[417,419,421,423],{"key":20,"text":418,"correct":22},"1～2",{"key":24,"text":420,"correct":22},"2～3",{"key":28,"text":422,"correct":22},"2～4",{"key":31,"text":424,"correct":26},"1～3",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},885381,"某建设项目有两个大气污染源排放同一种污染物，依据《环境影响评价技术导则—大气环境》，经估算模式计算出该污染物占标率10%的落地浓度所处的距离（D10%分别是2.2km和5km），该项目的评价范围边长是（ ）km。",[429,431,433,435],{"key":20,"text":430,"correct":22},"2.2",{"key":24,"text":432,"correct":22},"4.4",{"key":28,"text":434,"correct":22},"5",{"key":31,"text":436,"correct":26},"10",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},885382,"依据《环境影响评价技术导则—大气环境》，经估算模式计算出某项目排放污染物的最大地面浓度占标率Pmax为30%，占标率10%对应的落地浓度所处最远距离D10%为0.8km（厂界内），则该项目的大气评价等级和评价范围边长是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"一级、5km",{"key":24,"text":444,"correct":22},"二级、1.6km",{"key":28,"text":446,"correct":22},"三级、5km",{"key":31,"text":448,"correct":22},"三级、1.6km",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},885383,"ADMS-EIA版适用于评价范围（ ）的一级、二级评价项目。",[453,455,457,459],{"key":20,"text":454,"correct":26},"小于等于50km",{"key":24,"text":456,"correct":22},"大于等于50km",{"key":28,"text":458,"correct":22},"小于等于30km",{"key":31,"text":460,"correct":22},"大于等于30km",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},885384,"适用于评价范围大于等于50km的一级评价项目，以及复杂风场下的一级、二级评价项目的进一步预测模式为（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"ADMS模式系统",{"key":24,"text":468,"correct":22},"ADMS-EIA模式系统",{"key":28,"text":470,"correct":22},"AERMOD模式系统",{"key":31,"text":472,"correct":26},"CALPUFF模式系统",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},885385,"AERMOD模式使用每小时连续预处理气象数据模拟（ ）的浓度分布。",[477,479,481,483],{"key":20,"text":478,"correct":22},"小于等于1小时平均时间",{"key":24,"text":480,"correct":22},"小于1小时平均时间",{"key":28,"text":482,"correct":26},"大于等于1小时平均时间",{"key":31,"text":484,"correct":22},"大于1小时平均时间",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},885386,"进行大气环境影响评价时，最终应明确给出（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"对敏感区城、关心点及评价区域的大气环境质量的预测结果的分析和评价",{"key":24,"text":492,"correct":22},"项目选址、污染源的排放强度、排放方式、污染控制措施等的评述",{"key":28,"text":494,"correct":22},"对各种方案进行比较分析，给出推荐方案对评价区大气环境质量的影响",{"key":31,"text":496,"correct":26},"推荐方案对评价区域的大气环境质量影响的可行性结论",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},885387,"某建设项目用地长800m、宽500m，经计算该项目污染物排放占标率Pmax为87%，对应的D10%为2.0km，根据《环境影响评价技术导则—大气环境》，该项目大气环境影响评价工作等级判定为（ ）",[501,503,505,507],{"key":20,"text":502,"correct":26},"一级",{"key":24,"text":504,"correct":22},"二级",{"key":28,"text":506,"correct":22},"三级",{"key":31,"text":508,"correct":22},"条件不足，无法确定",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},885388,"下列污染物中，属于《恶臭污染物排放标准》规定的控制项目是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":26},"甲硫醚",{"key":24,"text":516,"correct":22},"甲醇",{"key":28,"text":518,"correct":22},"硝基苯",{"key":31,"text":520,"correct":22},"苯胺",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},885389,"下列关于《环境空气质量标准》（GB 3095—2012）中规定的常规大气监测项目的监测方法和频次说法错误的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"NO2和O3的分析都可使用化学发光法",{"key":24,"text":528,"correct":22},"凡进行小时平均采样的，采样时间均至少45分钟",{"key":28,"text":530,"correct":26},"凡进行日平均采样的，采样时间均至少18小时",{"key":31,"text":532,"correct":22},"一氧化碳的分析方法为非分散红外法",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},885390,"根据《大气污染物综合排放标准》，下列关于采样时间和频次的说法，正确的有（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"连续排放的排气筒必须连续1h采样获取平均值",{"key":24,"text":540,"correct":22},"污染事故排放监测时，采样时间不低于1h",{"key":28,"text":542,"correct":26},"无组织排放监控点监测采样，一般采用连续1h采样计平均值",{"key":31,"text":544,"correct":22},"排放时间小于1h间断性排放的排气筒，必须采样几个排放周期，满足采样总时间不低于1h的要求",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},885391,"《工业炉窑大气污染物排放标准》规定，各种工业炉窑烟囱（或排气筒）最低允许高度为（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"8m",{"key":24,"text":552,"correct":22},"10m",{"key":28,"text":554,"correct":26},"15m",{"key":31,"text":556,"correct":22},"20m",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},885392,"《大气污染物综合排放标准》规定，新污染源的排气筒一般不低于（ ）。",[561,562,563,564],{"key":20,"text":552,"correct":22},{"key":24,"text":554,"correct":26},{"key":28,"text":556,"correct":22},{"key":31,"text":565,"correct":22},"25m",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":28,"analysis":33},885393,"《大气污染物综合排放标准》规定，现有污染源颗粒物（除碳黑尘、染料尘、玻璃棉尘、石英粉尘、矿渣棉尘外）无组织排放监控浓度限值为（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"1.0mg\u002Fm3",{"key":24,"text":573,"correct":22},"2.0mg\u002Fm3",{"key":28,"text":575,"correct":26},"5.0mg\u002Fm3",{"key":31,"text":577,"correct":22},"8.0mg\u002Fm3",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},885394,"《大气污染物综合排放标准》规定，现有污染源排气筒颗粒物（除碳黑尘、染料尘、玻璃棉尘、石英粉尘、矿渣棉尘外）最高允许排放浓度为（ ）mg\u002Fm3。",[582,584,586,588],{"key":20,"text":583,"correct":26},"150",{"key":24,"text":585,"correct":22},"200",{"key":28,"text":587,"correct":22},"50",{"key":31,"text":589,"correct":22},"500",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},885395,"依据《大气污染物综合排放标准》，1996年建成的硝酸生产企业，其排放NOx最高允许排放浓度是（ ）mg\u002Fm3。",[594,596,598,600],{"key":20,"text":595,"correct":22},"240",{"key":24,"text":597,"correct":22},"420",{"key":28,"text":599,"correct":22},"1400",{"key":31,"text":601,"correct":26},"1700",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":31,"analysis":33},885396,"根据《大气污染物综合排放标准》，无组织排放监控点和参照点的采样时间一般为（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":22},"连续15min",{"key":24,"text":609,"correct":22},"连续30min",{"key":28,"text":611,"correct":22},"连续45min",{"key":31,"text":613,"correct":26},"连续1h",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]