[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-572-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},572,"环境影响评价技术导则与标准","建筑工程",0,16,50,1090,[13,34,46,58,70,82,92,104,116,128,138,150,162,174,186,198,210,222,234,246,255,267,279,291,303,315,323,331,339,347,355,367,375,387,395,403,415,427,435,447,459,471,483,498,510,523,536,548,561,573],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},886054,1,"单选题","下列选项中，属于一般工业固体废物的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","医院产生的临床废物",false,{"key":24,"text":25,"correct":22},"B","盛装危险废物的容器",{"key":27,"text":28,"correct":29},"C","炉渣",true,{"key":31,"text":32,"correct":22},"D","有放射性废物","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},886055,"依据《建设项目竣工环境保护验收技术规范—生态影响类》，验收调查工作阶段划分正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"初步调查、详细调查、编制调查报告三个阶段",{"key":24,"text":41,"correct":22},"初步调查、编制实施方案、详细调查、编制调查报告四个阶段",{"key":27,"text":43,"correct":29},"准备、初步调查、编制实施方案、详细调查、编制调查报告五个阶段",{"key":31,"text":45,"correct":22},"确定项目来源、准备、编制实施方案、详细调查、编制调查报告五个阶段",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},886056,"某建成的高速公路项目，短期内交通量无法达到设计能力的75%，根据《建项目竣工环境保护验牧技术规范—生态影响类》，该公路项目可进行竣工环境保护验收调查的运行工况要求是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"必须等待交通量达到设计能力的75%或以上",{"key":24,"text":53,"correct":22},"应在主体工程运行稳定、交通量必须达到设计能力的50%或以上",{"key":27,"text":55,"correct":22},"应在主体工程运行稳定、环境保护设施运行正常的条件下，交通量必须达到设计能力的25%或以上",{"key":31,"text":57,"correct":29},"应在主体工程运行稳定、环境保护设施运行正常的条件下进行，注明实际调查工况",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},886057,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，以下表述符合验收调查标准确定原则的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"只需按现行的环境保护标准进行验收调查",{"key":24,"text":65,"correct":22},"按环境影响评价文件批复后颁布的标准进行验收调查",{"key":27,"text":67,"correct":22},"按环境影响评价文件规定的标准验收调查，不用考虑现行标准",{"key":31,"text":69,"correct":29},"现阶段暂时还没有标准的可按实际调查给出结果",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},886058,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，验收调查工作详细调查阶段的工作内容不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"公众意见调查",{"key":24,"text":77,"correct":22},"污染源监测",{"key":27,"text":79,"correct":29},"区域生态特点调查",{"key":31,"text":81,"correct":22},"环境保护措施调查",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},886059,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，验收工作阶段划分为（ ）。",[86,87,89,90],{"key":20,"text":39,"correct":22},{"key":24,"text":88,"correct":22},"初步调查、调查因子识别与筛选、详细调查、编制调查报吿四个阶段",{"key":27,"text":43,"correct":29},{"key":31,"text":91,"correct":22},"确定项目来源、准备、初步调查、调查因子识别与筛选、详细调查、编制调查报告六个阶段",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},886060,"下列项目中，适用《建设项目竣工环境保护验收技术规范—生态影响类》的是（ ）",[96,98,100,102],{"key":20,"text":97,"correct":29},"风力发电项目",{"key":24,"text":99,"correct":22},"火力发电项目",{"key":27,"text":101,"correct":22},"热电联产项目",{"key":31,"text":103,"correct":22},"垃圾焚烧发电项目",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},886061,"验收调查范围原则上与（ ）的评价范围一致。",[108,110,112,114],{"key":20,"text":109,"correct":29},"环境影响评价文件",{"key":24,"text":111,"correct":22},"工程实际建设文件",{"key":27,"text":113,"correct":22},"工程设计文件",{"key":31,"text":115,"correct":22},"环境敏感目标变化文件",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},886062,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，验收调查的时段一般划分为（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"施工期、运行期和试运行期",{"key":24,"text":123,"correct":22},"施工期、运行近期和运行远期",{"key":27,"text":125,"correct":29},"工程前期、施工期和试运行期",{"key":31,"text":127,"correct":22},"工程前期、运行近期和运行远期",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},886064,"验收调查标准原则上采用建设项目（ ）经环境保护部门确认环境保护标准与环境保护设施工艺指标来进行验收的。",[132,134,135,137],{"key":20,"text":133,"correct":29},"环境影响评价阶段",{"key":24,"text":109,"correct":22},{"key":27,"text":136,"correct":22},"环境敏感目标变化",{"key":31,"text":111,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},886065,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，以下尚不具备验收调查运行工况要求的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":29},"环保设施正常运行，运量达到设计能力50%，但运行稳定的铁路工程",{"key":24,"text":145,"correct":22},"已正常运行但产油量只达到50%的油田开发工程",{"key":27,"text":147,"correct":22},"生产能力达到80%的矿山采选工程",{"key":31,"text":149,"correct":22},"生产能力达到75%的农业开发项目",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},886066,"生态影响的环境保护措施主要是针对（ ）进行保护。",[154,156,158,160],{"key":20,"text":155,"correct":22},"居住区",{"key":24,"text":157,"correct":22},"水环境",{"key":27,"text":159,"correct":29},"生态敏感目标（水生、陆生）",{"key":31,"text":161,"correct":22},"水土流失防治",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},886067,"根据《建设项目竣工环境保护验技术规范—生态影响类》，关于生态影响调查中的现场勘察，说法正确的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"如文件资料翔实，验收调查可不开展现场勘察",{"key":24,"text":169,"correct":22},"只选择项目涉及的区域与对象进行勘察",{"key":27,"text":171,"correct":29},"现场勘察的调查内容、位置、因子原则上与环评文件一致",{"key":31,"text":173,"correct":22},"如环评未开展样方调查，现场勘察不再需要开展样方调查",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},886068,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，不属于环境敏感目标调查内容的是（ ）",[178,180,182,184],{"key":20,"text":179,"correct":29},"土壤盐渍化区域与工程的位置关系",{"key":24,"text":181,"correct":22},"国家重点文物保护单位的保护内容",{"key":27,"text":183,"correct":22},"有特殊价值的生物物种资源分布区域的位置、规模",{"key":31,"text":185,"correct":22},"实际环境敏感目标与环境影响评价文件中的环境敏感目标的变化情况",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},886069,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，下列措施中，不属于降低或减缓公路项目污染影响的环境保护措施是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"噪声污染防治措施",{"key":24,"text":193,"correct":22},"废气污染防治措施",{"key":27,"text":195,"correct":22},"固体废物处置措施",{"key":31,"text":197,"correct":29},"占地恢复措施",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},886070,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，风电厂建设项目生态影响调查的内容不包括（ ）",[202,204,206,208],{"key":20,"text":203,"correct":22},"工程占地情况",{"key":24,"text":205,"correct":22},"工程影响区域内的水利设施状况",{"key":27,"text":207,"correct":29},"工程影响区域内的农作物耕作制度",{"key":31,"text":209,"correct":22},"工程影响区域内的水土流失现状",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},886071,"工程调查时提供工程平面布置图（或线路走向示意图），应标注（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"主要工程设施",{"key":24,"text":217,"correct":29},"主要工程设施和环境敏感目标",{"key":27,"text":219,"correct":22},"环境敏感目标",{"key":31,"text":221,"correct":22},"主要建筑物、河流、道路、人口分布",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},886072,"现场勘察的勘察区域与勘察对象应基本能覆盖建设项目所涉及区域的（ ）以上。",[226,228,230,232],{"key":20,"text":227,"correct":22},"70%",{"key":24,"text":229,"correct":22},"75%",{"key":27,"text":231,"correct":29},"80%",{"key":31,"text":233,"correct":22},"85%",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},886073,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，不属于验收调查中工程调查内容的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"工程运行状况",{"key":24,"text":241,"correct":29},"工程沿线状况",{"key":27,"text":243,"correct":22},"工程主要经济技术指标",{"key":31,"text":245,"correct":22},"工程投入试运行的时间",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},886074,"对于公路、铁路、轨道交通等线性工程以及港口项目，验收调查应在工况稳定、生产负荷达到近期预测生产能力（或交通量）（ ）以上的情况下进行。",[250,251,252,253],{"key":20,"text":227,"correct":22},{"key":24,"text":229,"correct":29},{"key":27,"text":231,"correct":22},{"key":31,"text":254,"correct":22},"90%",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},886075,"下列不属于环境保护目标的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"需特殊保护地区",{"key":24,"text":262,"correct":22},"生态敏感与脆弱区",{"key":27,"text":264,"correct":22},"社会关注区",{"key":31,"text":266,"correct":29},"工业园区",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},886076,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，工程影响区域内的下列调查工作中，属于生态影响调查的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":29},"不良地质地段分布状况及工程采取的防护措施调查",{"key":24,"text":274,"correct":22},"移民安置环境保护措施调查",{"key":27,"text":276,"correct":22},"野生动物保护措施调查",{"key":31,"text":278,"correct":22},"文物保护措施调查",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},886077,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，建设项目竣工环境保护验收详细调查阶段的工作内容不包括（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"环境质量和污染源监测",{"key":24,"text":286,"correct":29},"污染源和环境敏感目标调查",{"key":27,"text":288,"correct":22},"生态保护措施及其效果检查",{"key":31,"text":290,"correct":22},"环境保护措施和设施运行及其效果检查",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},886078,"根据工程建设过程，不属于验收调查时段的是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"工程前期",{"key":24,"text":298,"correct":22},"施工期",{"key":27,"text":300,"correct":22},"试运行期",{"key":31,"text":302,"correct":29},"服务期满后",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},886079,"在某工程竣工环境保护验收中，发现工程部分污染防治措施未落实。根据《建设项目竣工环境保护验收技术规范 生态影响类》，该工程竣工环境保护验收调查结论是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"建议不通过竣工环境保护验收",{"key":24,"text":310,"correct":22},"建议暂不通过竣工环境保护验收",{"key":27,"text":312,"correct":22},"提出整改方案后，建议通过竣工环境保护验收",{"key":31,"text":314,"correct":29},"限期整改后，建议通过竣工环境保护验收",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},886080,"下列项目中，适用《建设项目竣工环境保护验收技术规范, 生态影响类》的是（ ）。",[319,320,321,322],{"key":20,"text":97,"correct":29},{"key":24,"text":99,"correct":22},{"key":27,"text":101,"correct":22},{"key":31,"text":103,"correct":22},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":20,"analysis":33},886081,"根据《建设项目竣工环境保护验收技术规范生态影响类》工程影响区域内的下列调查工作中，属于生态影响调查的是 ( )。",[327,328,329,330],{"key":20,"text":272,"correct":29},{"key":24,"text":274,"correct":22},{"key":27,"text":276,"correct":22},{"key":31,"text":278,"correct":22},{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},886082,"根据《建设项目竣工环境保护验收技术规范生态影响类》，建设项目竣工环境保护验收详细调查阶段的工作内容不包括 ( )。",[335,336,337,338],{"key":20,"text":284,"correct":22},{"key":24,"text":286,"correct":29},{"key":27,"text":288,"correct":22},{"key":31,"text":290,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},886083,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，不属于环境敏感目标调查内容的是（ ）。",[343,344,345,346],{"key":20,"text":179,"correct":29},{"key":24,"text":181,"correct":22},{"key":27,"text":183,"correct":22},{"key":31,"text":185,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},886084,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，验收调查工作详细调查阶段的工作内容不包括（ ）。",[351,352,353,354],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},886085,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，验收调查的重点不包括（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"环境敏感目标变更情况",{"key":24,"text":362,"correct":22},"主要污染因子达标情况",{"key":27,"text":364,"correct":22},"环境风险防范措施的有效性",{"key":31,"text":366,"correct":29},"主体工程的施工质量",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":27,"analysis":33},886086,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，验收调查的时段一般划分为（ ）。",[371,372,373,374],{"key":20,"text":121,"correct":22},{"key":24,"text":123,"correct":22},{"key":27,"text":125,"correct":29},{"key":31,"text":127,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},886087,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，下列调查内容中，不属于生态影响调查内容的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"工程临时及永久占地情况",{"key":24,"text":382,"correct":29},"工程影响区域内河流、水源地的变化情况",{"key":27,"text":384,"correct":22},"工程影响区域内植被类型、数量、覆盖率的变化情况",{"key":31,"text":386,"correct":22},"工程影响区域内不良地质地段分布状况及工程采取的防护措施",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},886088,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，风电厂建设项目生态影响调查的内容不包括（ ）。",[391,392,393,394],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":22},{"key":27,"text":207,"correct":29},{"key":31,"text":209,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},886089,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，不属于验收调查中工程调查内容的是（ ）。",[399,400,401,402],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":29},{"key":27,"text":243,"correct":22},{"key":31,"text":245,"correct":22},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},886090,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，“环境敏感目标调查”的内容不包括（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"地质公园的地理位置",{"key":24,"text":410,"correct":29},"项目的职工生活区位置",{"key":27,"text":412,"correct":22},"鱼虾产卵场与工程的相对位置关系",{"key":31,"text":414,"correct":22},"基本农田保护区与工程的相对位置关系",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},886091,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，“工程调查”的内容不包括（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"工程总投资",{"key":24,"text":422,"correct":22},"工程环境保护投资",{"key":27,"text":424,"correct":29},"水环境保护措施落实情况",{"key":31,"text":426,"correct":22},"工程环境影响评价文件审批时间",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":27,"analysis":33},886092,"根据《建设项目竣工环境保护验技术规范 生态影响类》，关于生态影响调查中的现场勘察，说法正确的是（ ）。",[431,432,433,434],{"key":20,"text":167,"correct":22},{"key":24,"text":169,"correct":22},{"key":27,"text":171,"correct":29},{"key":31,"text":173,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},886093,"发生在由于近期活跃的自然地理过程，如冰川退缩或侵蚀发生的那些地区的演替称为（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"次生演替",{"key":24,"text":442,"correct":29},"原生演替",{"key":27,"text":444,"correct":22},"人工演替",{"key":31,"text":446,"correct":22},"自然演替",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},886094,"生态影响调查结论与建议中，总结的内容主要是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":29},"建设项目对环境影响评价文件及环境影响评价审批文件要求的落实情况",{"key":24,"text":454,"correct":22},"建设项目对环境保护行政主管部门颁布的法律法规执行情况",{"key":27,"text":456,"correct":22},"建设项目执行环境保护标准的情况",{"key":31,"text":458,"correct":22},"建设项目对环保措施的投入运行情况",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},886095,"根据《建设项目竣工环境保护验收技术规范—生态影响类》，以下不属于公路建设工程验收调查的重点是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"核实实际工程内容变更情况",{"key":24,"text":466,"correct":22},"环境保护制度执行情况",{"key":27,"text":468,"correct":29},"汽车尾气对公路收费人员身体健康的危害",{"key":31,"text":470,"correct":22},"工程环保投资情况",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},886096,"根据《建设项目竣工环境保护验收技术规范 生态影响类》，下列措施中，不属于针对生态敏感目标（水生、陆生）的生态保护措施是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"设置野生动物通道",{"key":24,"text":478,"correct":22},"低温水缓解工程措施",{"key":27,"text":480,"correct":29},"固体废物防渗措施",{"key":31,"text":482,"correct":22},"生态用水泄水建筑物及运行方案",{"id":484,"libraryId":5,"type":485,"typeLabel":486,"stem":487,"options":488,"answer":497,"analysis":33},886098,2,"多选题","管理性监督体现对标准实施的监察与督导，其基本出发点是“达标”，采用的手段一般包括（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":29},"监督性监测",{"key":24,"text":492,"correct":29},"监督性检查",{"key":27,"text":494,"correct":29},"监督性抽查",{"key":31,"text":496,"correct":22},"监督性管理","ABC",{"id":499,"libraryId":5,"type":485,"typeLabel":486,"stem":500,"options":501,"answer":497,"analysis":33},886099,"关于国家环境标准样品的实施，下列说法正确的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":29},"对各级环境监测分析实验室及分析人员进行质量控制考核",{"key":24,"text":505,"correct":29},"校准、检验分析仪器",{"key":27,"text":507,"correct":29},"配制标准溶液",{"key":31,"text":509,"correct":22},"评价分析者的技术",{"id":511,"libraryId":5,"type":485,"typeLabel":486,"stem":512,"options":513,"answer":522,"analysis":33},886100,"我国的污染物排放标准主要分为（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":29},"大气污染物排放标准",{"key":24,"text":517,"correct":29},"水污染物排放标准",{"key":27,"text":519,"correct":29},"环境噪声排放标准",{"key":31,"text":521,"correct":29},"固体废物污染控制标准","ABCD",{"id":524,"libraryId":5,"type":485,"typeLabel":486,"stem":525,"options":526,"answer":535,"analysis":33},886101,"某省2000年颁布了严于国家的地方大气污染物排放标准，规定A污染物和B污染物排放分别执行80mg\u002Fm3和400mg\u002Fm3。2003年国家修订原大气污染物排放标准，要求A污染物和B污染物排放分别执行100mg\u002Fm3和200mg\u002Fm3。目前该省A污染物和B污染物排放标准应分别执行（ ）mg\u002Fm3。",[527,529,531,533],{"key":20,"text":528,"correct":29},"A污染物80",{"key":24,"text":530,"correct":22},"A污染物100",{"key":27,"text":532,"correct":29},"B污染物200",{"key":31,"text":534,"correct":22},"B污染物400","AC",{"id":537,"libraryId":5,"type":485,"typeLabel":486,"stem":538,"options":539,"answer":497,"analysis":33},886102,"下列关于环境保护标准的说法正确的有（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":29},"环境保护标准是环境保护规划的体现",{"key":24,"text":543,"correct":29},"环境保护标准是环境保护行政主管部门依法行政的依据",{"key":27,"text":545,"correct":29},"环境保护标准是推动环境保护科技进步的一个动力",{"key":31,"text":547,"correct":22},"环境保护标准是推动国家经济发展的前提",{"id":549,"libraryId":5,"type":485,"typeLabel":486,"stem":550,"options":551,"answer":560,"analysis":33},886103,"（ ）统一了环境质量标准和污染物排放标准实施的技术要求。",[552,554,556,558],{"key":20,"text":553,"correct":22},"国家环境标准",{"key":24,"text":555,"correct":29},"环境监测类标准",{"key":27,"text":557,"correct":29},"管理规范类标准",{"key":31,"text":559,"correct":29},"环境基础标准","BCD",{"id":562,"libraryId":5,"type":485,"typeLabel":486,"stem":563,"options":564,"answer":535,"analysis":33},886104,"关于国家环境标准与地方环境标准关系的说法，正确的有（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":29},"对于国家环境质量标准未规定的项目，可以制定地方环境质量标准",{"key":24,"text":568,"correct":22},"对于国家环境质量标准已规定的项目，不得制定地方环境质量标准",{"key":27,"text":570,"correct":29},"对于国家污染物排放标准未规定的项目，可以制定地方污染物排放标准",{"key":31,"text":572,"correct":22},"对于国家污染物排放标准已规定的项目，不得制定地方污染物排放标准",{"id":574,"libraryId":5,"type":485,"typeLabel":486,"stem":575,"options":576,"answer":585,"analysis":33},886105,"以下属于地方级环境保护标准的有（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":29},"地方环境质量标准",{"key":24,"text":580,"correct":29},"地方污染物排放标准",{"key":27,"text":582,"correct":22},"地方环境监测方法标准",{"key":31,"text":584,"correct":22},"地方环境标准样品标准","AB",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]