[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-572-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},572,"环境影响评价技术导则与标准","建筑工程",0,12,50,1090,[13,34,46,56,68,80,90,102,114,123,134,146,158,170,182,194,206,218,230,241,250,262,274,284,295,307,319,331,343,355,367,379,391,403,415,427,439,450,462,474,486,498,508,520,532,544,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},885854,1,"单选题","根据《环境影响评价技术导则—生态影响》，关于生态影响防护、恢复与补偿原则的说法，错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","涉及到敏感生态保护目标时，须提出可靠的避让措施或生境替代方案",true,{"key":24,"text":25,"correct":26},"B","应按照避让、减缓、补偿和重建的次序提出生态影响防护与恢复的措施",false,{"key":28,"text":29,"correct":26},"C","所采取的生态影响防护、恢复的措施的效果应有利于修复和增强区域生态功能",{"key":31,"text":32,"correct":26},"D","应按项目实施阶段分别提出各项生态保护措施，并提出实施时限和估算经费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},885855,"根据《环境影响评价技术导则—生态影响》，把两个以上的生态信息叠合到一张图上，构成复合图，用以表示生态变化的方向和程度，此种生态现状评价方法为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"生态机理分析法",{"key":24,"text":41,"correct":22},"图形叠置法",{"key":28,"text":43,"correct":26},"质量指标法",{"key":31,"text":45,"correct":26},"生产力评价法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},885856,"根据《环境影响评价技术导则—生态影响》，生态现状评价不常用的方法是（ ）。",[50,51,52,54],{"key":20,"text":41,"correct":26},{"key":24,"text":45,"correct":22},{"key":28,"text":53,"correct":26},"类比法",{"key":31,"text":55,"correct":26},"系统分析法",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},885857,"某项目占地面积5km2，涉及省级森林公园，根据《环境影响评价技术导则—生态影响》，下列关于该项目生态影响评价的说法，正确的是（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":26},"该项目生态影响评价等级为一级",{"key":24,"text":63,"correct":22},"生态背景调查必须说明森林公园功能区划和保护要求",{"key":28,"text":65,"correct":26},"生态现状调查必须开展遥感调查分析",{"key":31,"text":67,"correct":26},"生态现状评价必须对评价区域生态特征进行定量分析",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":31,"analysis":33},885858,"根据《环境影响评价技术导则—生态影响》，环境质量指标法的基本公式是 式中Ehi和Wi的单位应分别是（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":26},"有量纲和有量纲",{"key":24,"text":75,"correct":26},"有量纲和无量纲",{"key":28,"text":77,"correct":26},"无量纲和有量纲",{"key":31,"text":79,"correct":22},"无量纲和无量纲",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":33},885859,"根据《环境影响评价技术导则—生态影响》，将拟实施的开发建设活动的影响因素与可能受影响的环境因子分别列在同一张表格的行与列内，逐点进行分析，并逐条阐明影响的性质、强度等。该分析开发建设活动的生态影响方法称为（ ）。",[84,86,87,88],{"key":20,"text":85,"correct":22},"列表清单法",{"key":24,"text":41,"correct":26},{"key":28,"text":39,"correct":26},{"key":31,"text":89,"correct":26},"网络法",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},885860,"根据《环境影响评价技术导则—生态影响》，生态保护措施的基本内容不包括（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"生态保护措施的工艺",{"key":24,"text":97,"correct":26},"施工期工程环境监理计划",{"key":28,"text":99,"correct":22},"环境现状监测方案",{"key":31,"text":101,"correct":26},"重大生态影响项目的长期生态监测方案",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},885861,"根据《环境影响评价技术导则—生态影响》，下列关于生态影响预测与评价内容的说法，错误的是（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":26},"预测生态系统组成和服务功能的变化趋势",{"key":24,"text":109,"correct":22},"重点关注可逆影响和累积生态影响",{"key":28,"text":111,"correct":26},"预测评价项目对区域现存主要生态问题的影响趋势",{"key":31,"text":113,"correct":26},"分析项目生态影响作用的方式、范围、强度和持续时间",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},885862,"能评价生态系统演替趋势，预测动物和植物个体、种群和群落的影响，并预测生态系统演替方向的方法是（ ）。",[118,119,121,122],{"key":20,"text":39,"correct":22},{"key":24,"text":120,"correct":26},"景观生态学法",{"key":28,"text":55,"correct":26},{"key":31,"text":43,"correct":26},{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},885863,"根据《环境影响评价技术导则—生态影响》，关于生态影响预测与评价内容的说法，错误的是（ ）。",[127,128,130,132],{"key":20,"text":111,"correct":26},{"key":24,"text":129,"correct":26},"依据区域生态保护的需要和受影响生态系统的主导生态功能选择评价预测指标",{"key":28,"text":131,"correct":26},"通过分析影响作用的方式、范围、强度和持续时间来判别生态系统受影响的范围、强度和持续时间",{"key":31,"text":133,"correct":22},"预测生态系统组成和服务功能的变化趋势，重点关注不利影响，并简要分析不可逆影响和累积生态影响",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},885864,"某河建设的拦河闸堤明显改变了该河道的水文情势，严重影响了下游20km处一重要水生生物的自然产卵场（影响面积小于2.0km2）。根据《环境影响评价技术导则—生态影响》，该拦河闸堤的生态影响评价工作等级判定结果是（ ）。",[138,140,142,144],{"key":20,"text":139,"correct":26},"一级",{"key":24,"text":141,"correct":22},"二级",{"key":28,"text":143,"correct":26},"三级",{"key":31,"text":145,"correct":26},"可仅做生态影响分析",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},885865,"根据《环境影响评价技术导则—生态影响》，下列内容中，不属于生态背景调查的是（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"影响区域内涉及的物种多样性、群落的生物量和生产力状况",{"key":24,"text":153,"correct":26},"影响区域内相关的非生物因子特征（如气候、土壤、地形地貌等）",{"key":28,"text":155,"correct":26},"影响区域内受保护的地方特有物种、保护级别、保护状况等",{"key":31,"text":157,"correct":26},"影响区域内涉及的生态系统类型、结构、功能和过程",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},885866,"根据《环境影响评价技术导则—生态影响》，建设项目生态评价工作范围确定依据不包括（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"建设项目与所在区域行政隶属的关系",{"key":24,"text":165,"correct":26},"建设项目与所在区域生物过程的关系",{"key":28,"text":167,"correct":26},"建设项目与所在区域气候过程的关系",{"key":31,"text":169,"correct":26},"建设项目与所在区域水文过程的关系",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":28,"analysis":33},885867,"根据《环境影响评价技术导则—生态影响》，生态影响评价的范围主要根据评价区域与周边环境的（ ）确定。",[174,176,178,180],{"key":20,"text":175,"correct":26},"景观",{"key":24,"text":177,"correct":26},"生物量",{"key":28,"text":179,"correct":22},"生态完整性",{"key":31,"text":181,"correct":26},"植被覆盖率",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":31,"analysis":33},885868,"根据《环境影响评价技术导则—生态影响》，下列关于生态现状调查的说法，错误的是（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":26},"调查内容和指标应能反映评价范围内的生态背景特征",{"key":24,"text":189,"correct":26},"应针对敏感生态保护目标开展专题调查",{"key":28,"text":191,"correct":26},"应调查影响区域已存在的主要生态问题",{"key":31,"text":193,"correct":22},"生态现状调查范围可小于评价工作范围",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":31,"analysis":33},885869,"根据《环境影响评价技术导则—生态影响》，高速公路项目环境影响评价中，工程分析的重点是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":26},"环境质量现状调查",{"key":24,"text":201,"correct":26},"工程总投资情况",{"key":28,"text":203,"correct":26},"项目所处地理位置",{"key":31,"text":205,"correct":22},"工程挖填土石方平衡情况",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},885870,"根据《环境影响评价技术导则—生态影响》，下列评价内容中，不属于生态现状评价内容的是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"分析和评价生态系统受影响的范围、强度和持续时间",{"key":24,"text":213,"correct":26},"分析和评价影响区域内动、植物等生态因子的现状组成、分布",{"key":28,"text":215,"correct":26},"在阐明生态系统现状的基础上，分析影响区域内生态系统状况的主要原因",{"key":31,"text":217,"correct":26},"评价生态系统的结构与功能状况、生态系统面临压力和存在的问题、生态系统的总体变化趋势等",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":31,"analysis":33},885871,"根据《环境影响评价技术导则—生态影响》，三级评价项目基本图件不包括（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":26},"项目区域地理位置图",{"key":24,"text":225,"correct":26},"工程平面图",{"key":28,"text":227,"correct":26},"土地利用现状图",{"key":31,"text":229,"correct":22},"植被类型图",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},885872,"依据《环境影响评价技术导则—生态影响》，某公路工程需进行生态影响3级评价，其生态现状评价中生态制图必须配有的基本图件是（ ）。[2009年真题]",[234,236,238,240],{"key":20,"text":235,"correct":26},"植被现状图",{"key":24,"text":237,"correct":26},"土壤侵蚀分布现状图",{"key":28,"text":239,"correct":26},"工程平纵断面图",{"key":31,"text":227,"correct":22},{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":28,"analysis":33},885873,"某建设项目生态影响评价工作等级为三级，根据《环境影响评价技术导则—生态影响》，该生态影响评价可不制作的图件是（ ）",[245,246,247,249],{"key":20,"text":225,"correct":26},{"key":24,"text":227,"correct":26},{"key":28,"text":248,"correct":22},"生态监测布点图",{"key":31,"text":223,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},885874,"为保证生态影响评价的准确性和科学性，生态影响评价制图的工作精度一般不低于（ ），成图精度应满足生态影响判别和生态保护措施的实施。",[254,256,258,260],{"key":20,"text":255,"correct":26},"工程可靠性研究制图精度",{"key":24,"text":257,"correct":22},"工程可行性研究制图精度",{"key":28,"text":259,"correct":26},"工程时效性研究制图精度",{"key":31,"text":261,"correct":26},"工程恢复性研究制图精度",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},885875,"根据《环境影响评价技术导则—生态影响》，关于生态影响评价图件制作规范与要求的说法，错误的是（ ）。[2018年真题]",[266,268,270,272],{"key":20,"text":267,"correct":26},"项目区域地理位置图成图比例未作规定",{"key":24,"text":269,"correct":26},"当成图范围过大时，可采用点线面相结合的方式，分幅成图",{"key":28,"text":271,"correct":26},"生态影响评价图件制作基础数据来源包括已有图件资料、采样等信息",{"key":31,"text":273,"correct":22},"当评价工作等级为二级及以上时，应分幅单独成图，以提高成图精度",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},885876,"根据《环境影响评价技术导则—生态影响》，下列生态影响预测与评价兼具定性和半定量特点的评价方法是（ ）。",[278,279,281,282],{"key":20,"text":85,"correct":26},{"key":24,"text":280,"correct":22},"类比分析法",{"key":28,"text":120,"correct":26},{"key":31,"text":283,"correct":26},"单因子指数法",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},885877,"根据《环境影响评价技术导则—生态影响》，关于生态影响的防护、恢复原则的说法，错误的是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"涉及珍稀濒危物种时，必须提出恢复、修复和补偿措施",{"key":24,"text":291,"correct":26},"涉及特殊生态敏感区时，必须提出可靠的避让措施或生境替代方案",{"key":28,"text":293,"correct":26},"所采取生态影响防护与恢复措施的效果应有利于修复和增强区域生态功能",{"key":31,"text":32,"correct":26},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},885878,"根据《环境影响评价技术导则—生态影响》，可用景观生态学法开展生态现状评价的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"物种多样性丰富程度",{"key":24,"text":302,"correct":26},"森林生态系统生物量",{"key":28,"text":304,"correct":22},"区域生态系统空间结构",{"key":31,"text":306,"correct":26},"河流水生生物群落结构",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},885879,"根据《环境影响评价技术导则—生态影响》，关于替代方案的说法，错误的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"最终选定的替代方案应是生态影响最小的方案",{"key":24,"text":314,"correct":26},"应对项目的组成和内容的替代方案进行生态可行性论证",{"key":28,"text":316,"correct":26},"应对项目选线、选址的替代方案进行生态可行性论证",{"key":31,"text":318,"correct":26},"应对项目施工和运营方案的替代方案进行生态可行性论证",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},885880,"下列建设项目中，其环境风险评价不适用《建设项目环境风险评价技术导则》的是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"核电站项目",{"key":24,"text":326,"correct":26},"煤化工项目",{"key":28,"text":328,"correct":26},"铜冶炼项目",{"key":31,"text":330,"correct":26},"铁矿开采项目",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},885881,"环境风险评价的目的是分析和预测建设项目存在的潜在危险、有害因素，建设项目（ ）可能发生的突发性事件或事故，引起有毒有害和易燃易爆等物质泄漏，所造成的人身安全与环境影响和损害程度，提出合理可行的防范、应急与减缓措施，以使建设项目事故率、损失和环境影响达到可接受的水平。",[335,337,339,341],{"key":20,"text":336,"correct":26},"建设期间",{"key":24,"text":338,"correct":26},"运行期间",{"key":28,"text":340,"correct":26},"建设、运行、退役期间",{"key":31,"text":342,"correct":22},"建设和运行期间",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},885882,"以下风险事故不适用《建设项目环境风险评价技术导则》的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"甲醇罐爆炸",{"key":24,"text":350,"correct":26},"液氮罐爆炸",{"key":28,"text":352,"correct":26},"天然气田井喷",{"key":31,"text":354,"correct":22},"炼油厂污水处理厂输送管道断裂",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":28,"analysis":33},885883,"按照《建设项目环境风险评价技术导则》，环境风险评价工作级别判定依据是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":26},"行业特点、重大危险源判定结果以及环境敏感程度",{"key":24,"text":362,"correct":26},"环境敏感程度、贮存危险性物质数量以及物质危险性",{"key":28,"text":364,"correct":22},"环境敏感程度、重大危险源判定结果以及物质危险性",{"key":31,"text":366,"correct":26},"物质危险性、重大危险源判定结果以及贮存危险性物质数量",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},885884,"重大危险源是指长期或短期生产、加工、运输、使用或贮存危险物质，且危险物质的数量（ ）临界量的功能单元。",[371,373,375,377],{"key":20,"text":372,"correct":26},"等于",{"key":24,"text":374,"correct":22},"等于或超过",{"key":28,"text":376,"correct":26},"等于或低于",{"key":31,"text":378,"correct":26},"超过",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},885885,"环境风险评价的基本内容不包括（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"风险识别",{"key":24,"text":386,"correct":26},"源项分析",{"key":28,"text":388,"correct":26},"后果计算",{"key":31,"text":390,"correct":22},"风险预测",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},885886,"环境资料主要应收集有关拟建项目附近居民分布及敏感目标方位、距离、重要水环境和（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"环境资料",{"key":24,"text":398,"correct":22},"生态保护资料",{"key":28,"text":400,"correct":26},"事故资料",{"key":31,"text":402,"correct":26},"项目工程资料",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},885887,"以下适用于《建设项目环境风险评价技术导则》的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":26},"核建设项目",{"key":24,"text":410,"correct":22},"化肥厂氨罐扩建项目",{"key":28,"text":412,"correct":26},"火电厂供水系统改造项目",{"key":31,"text":414,"correct":26},"新建维修厂通风系统项目",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},885888,"根据《建设项目环境风险评价技术导则》，以下应进行环境风险评价的建设项目是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"钢材物流中心",{"key":24,"text":422,"correct":26},"海滨浴场",{"key":28,"text":424,"correct":22},"鞭炮储存仓库",{"key":31,"text":426,"correct":26},"核电站",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},885889,"根据《建设项目环境风险评价技术导则》，环境风险类型不包括（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"爆炸",{"key":24,"text":434,"correct":26},"泄露",{"key":28,"text":436,"correct":22},"洪灾",{"key":31,"text":438,"correct":26},"火灾",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},885890,"下列建设项目不适用《建设项目环境风险评价技术导则》的是（ ）。",[443,444,446,448],{"key":20,"text":408,"correct":22},{"key":24,"text":445,"correct":26},"铁矿矿山新建项目",{"key":28,"text":447,"correct":26},"电子芯片新建项目",{"key":31,"text":449,"correct":26},"钢铁厂高炉扩建项目",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},885891,"环境风险一级评价应按《建设项目环境风险评价技术导则》对事故影响进行（ ）预测，说明影响范围和程度，提出防范、减缓和应急措施。",[454,456,458,460],{"key":20,"text":455,"correct":22},"定量",{"key":24,"text":457,"correct":26},"定性",{"key":28,"text":459,"correct":26},"定量或定性",{"key":31,"text":461,"correct":26},"半定量",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},885892,"《建设项目环境风险评价技术导则》中，环境风险分为（ ）三种类型。",[466,468,470,472],{"key":20,"text":467,"correct":26},"火灾、爆炸、中毒",{"key":24,"text":469,"correct":26},"爆炸、恶臭、中毒",{"key":28,"text":471,"correct":26},"火灾、泄漏、恶臭",{"key":31,"text":473,"correct":22},"爆炸、泄漏、火灾",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},885893,"环境风险评价中的最大可信事故是指在所有预测概率不为零的事故中，（ ）的事故。",[478,480,482,484],{"key":20,"text":479,"correct":26},"发生概率最大",{"key":24,"text":481,"correct":26},"安全隐患最大",{"key":28,"text":483,"correct":26},"造成财产损失最大",{"key":31,"text":485,"correct":22},"对环境（或健康）危害最严重",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},885894,"下列对于环境风险评价与安全评价之间关系的表述，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"安全评价包括环境风险评价",{"key":24,"text":493,"correct":26},"环境风险评价与安全评价不相关",{"key":28,"text":495,"correct":26},"安全评价即是环境风险评价",{"key":31,"text":497,"correct":22},"安全评价的资料可用于环境风险评价",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},885895,"在环境风险评价的资料收集和准备中，主要收集建设项目的资料不包括（ ）。",[502,504,505,507],{"key":20,"text":503,"correct":26},"工程资料",{"key":24,"text":396,"correct":26},{"key":28,"text":506,"correct":22},"风险资料",{"key":31,"text":400,"correct":26},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},885896,"下列建设项目中，不适用《建设项目环境风险评价技术导则》的有（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"800万t\u002Fa钢铁项目",{"key":24,"text":515,"correct":26},"4500t\u002Fd水泥熟料项目",{"key":28,"text":517,"correct":26},"2000t\u002Fd金矿采选项目",{"key":31,"text":519,"correct":22},"2000MW核电项目",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},885897,"按照《建设项目环境风险评价技术导则》，一级环境风险评价的完整工作内容是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":26},"对事故影响说明影响范围和程度，提出应急措施",{"key":24,"text":527,"correct":26},"对事故影响说明影响范围和程度，制定应急措施",{"key":28,"text":529,"correct":26},"定量预测，提出防范措施，制定应急预案",{"key":31,"text":531,"correct":22},"定量预测，说明影响范围和程度，提出防范、减缓和应急措施",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},885898,"根据《建设项目环境风险评价技术导则》，（ ）不属于风险识别范围。[2010年真题]",[536,538,540,542],{"key":20,"text":537,"correct":26},"公用工程系统",{"key":24,"text":539,"correct":22},"环境风险水平",{"key":28,"text":541,"correct":26},"工程环保设施",{"key":31,"text":543,"correct":26},"生产过程排放的“三废”污染物",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},885899,"根据《建设项目环境风险评价技术导则》，（ ）属于环境风险事故。",[548,550,552,554],{"key":20,"text":549,"correct":26},"试车期间的超标排放",{"key":24,"text":551,"correct":22},"突然停电造成有毒有害物质的泄露",{"key":28,"text":553,"correct":26},"大修前设备、管道吹扫造成的超标排放",{"key":31,"text":555,"correct":26},"生活污水处理装置运行异常造成的超标排放",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},885900,"进行环境风险评价时，风险识别的内容不包括（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":26},"资料收集和准备",{"key":24,"text":563,"correct":26},"物质风险识别",{"key":28,"text":565,"correct":26},"生产设施风险识别",{"key":31,"text":567,"correct":22},"安全风险识别",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},885901,"开展规划环境影响评价时，累积影响分析应当从（ ）两个方面进行。",[572,574,576,578],{"key":20,"text":573,"correct":26},"社会与经济",{"key":24,"text":575,"correct":22},"时间与空间",{"key":28,"text":577,"correct":26},"污染因子与污染物浓度",{"key":31,"text":579,"correct":26},"环境污染与环境治理",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},885902,"根据《规划环境影响评价技术导则—总纲》，下列内容中，不属于跟踪评价方案一般内容的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"评价的时段",{"key":24,"text":587,"correct":26},"主要评价内容",{"key":28,"text":589,"correct":22},"规划方案比选",{"key":31,"text":591,"correct":26},"管理机构设置及其职责定位",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},885903,"根据《规划环境影响评价技术导则—总纲》，关于评价范围确定的说法，错误的是（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"按环境要素和区域开发建设情况确定评价范围",{"key":24,"text":599,"correct":26},"在时间跨度上，评价范围一般应包括整个规划周期",{"key":28,"text":601,"correct":26},"在空间跨度上，评价范围一般应包括规划区域、规划实施影响的周边地域",{"key":31,"text":603,"correct":26},"评价范围确定应考虑自然地理单元、气候单元、水文单元、生态单元等的完整性",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]