[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886377":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886377,572,2,"多选题","生态影响调查结论是全部调查工作的结论，编写时重点概括说明（ ），在此基础上，对环境保护措施提出改进措施和建议。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程建设成后产生的主要环境问题",true,{"key":16,"text":17,"correct":18},"B","工程建设前后的主要环境问题",false,{"key":20,"text":21,"correct":14},"C","现有环境保护措施的有效性",{"key":23,"text":24,"correct":18},"D","公众调查的意见","AC","生态影响调查结论是全部调查工作的结论，编写时要总结建设项目对环境影响评价文件及环境影响评价审批文件要求的落实情况。重点概括说明工程建设成后产生的主要环境问题及现有环境保护措施的有效性，在此基础上，对环境保护措施提出改进措施和建议。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]