[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886372":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886372,572,2,"多选题","根据生态影响的调查和分析的结果，客观、明确地从技术角度论证工程是否符合建设项目竣工环境保护验收条件，主要包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不能通过竣工环境保护验收",false,{"key":16,"text":17,"correct":18},"B","建议通过竣工环境保护验收",true,{"key":20,"text":21,"correct":14},"C","处罚后，建议通过竣工环境保护验收",{"key":23,"text":24,"correct":18},"D","限期整改后，建议通过竣工环境保护验收","BD","根据调查和分析的结果，客观、明确地从技术角度论证工程是否符合建设项目竣工环境保护验收条件，主要包括：①建议通过竣工环境保护验收；②限期整改后，建议通过竣工环境保护验收。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]