[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886366":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},886366,572,2,"多选题","对于（ ）项目，验收调查应在工况稳定、生产负荷达到近期预测生产能力（或交通量）75%以上的情况下进行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","公路",true,{"key":16,"text":17,"correct":14},"B","铁路",{"key":19,"text":20,"correct":14},"C","轨道交通",{"key":22,"text":23,"correct":14},"D","港口","ABCD","对于公路、铁路、轨道交通等线性工程以及港口项目，验收调查应在工况稳定、生产负荷达到近期预测生产能力（或交通量）75%以上的情况下进行；如果短期内生产能力（或交通量）确实无法达到设计能力75%或以上的，验收调查应在主体工程运行稳定、环境保护设施运行正常的条件下进行，注明实际调查工况，并按环境影响评价文件近期的设计能力（或交通量）对主要环境要素进行影响分析。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]