[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886361":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},886361,572,2,"多选题","危险废物产生量核算方法有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","物料衡算法",true,{"key":16,"text":17,"correct":14},"B","类比法",{"key":19,"text":20,"correct":14},"C","实测法",{"key":22,"text":23,"correct":14},"D","产排污系数法","ABCD","采用物料衡算法、类比法、实测法、产排污系数法等相结合的方法核算建设项目危险废物的产生量。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]