[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886249":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886249,572,2,"多选题","土壤环境影响评价工作程序中准备阶段的工作包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","了解项目工程背景与概况",true,{"key":16,"text":17,"correct":18},"B","土壤环境质量现状监测",false,{"key":20,"text":21,"correct":14},"C","环境影响识别",{"key":23,"text":24,"correct":14},"D","工程分析","ACD","根据《环境影响评价技术导则—土壤环境（试行）》（HJ 964—2018），土壤环境影响评价工作程序准备阶段包括：①相关资料收集，了解项目工程背景与概况；②现场踏勘、工程分析；③环境影响识别；④评价工作等级、评价范围以及评价重点。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]