[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886245":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886245,572,2,"多选题","土壤环境影响评价中建设项目土壤环境保护措施包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","土壤环境质量现状保障措施",true,{"key":16,"text":17,"correct":14},"B","源头控制措施",{"key":19,"text":20,"correct":21},"C","技术开发措施",false,{"key":23,"text":24,"correct":14},"D","过程防控措施","ABD","根据《环境影响评价技术导则—土壤环境（试行）》（HJ 964—2018），建设项目环境保护措施包括：①土壤环境质量现状保障措施；②源头控制措施；③过程防控措施。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]