[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886182":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886182,572,2,"多选题","有关对建设项目地下水环境影响预测方法的叙述中，正确的方法有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","数学模型法",true,{"key":16,"text":17,"correct":18},"B","现场调查法",false,{"key":20,"text":21,"correct":18},"C","标准指数法",{"key":23,"text":24,"correct":14},"D","类比分析法","AD","根据《环境影响评价技术导则—地下水环境》（HJ 610—2016）规定，建设项目地下水环境影响预测方法包括数学模型法和类比分析法。其中，数学模型法包括数值法、解析法等。一般情况下，一级评价应采用数值法，不宜概化为等效多孔介质的地区除外；二级评价中水文地质条件复杂且适宜采用数值法时，建议优先采用数值法；三级评价可采用解析法或类比分析法。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]