[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886181":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886181,572,2,"多选题","地下水环境影响预测时段应包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","污染发生后100d",true,{"key":16,"text":17,"correct":14},"B","污染发生后1000d",{"key":19,"text":20,"correct":21},"C","项目建设期",false,{"key":23,"text":24,"correct":14},"D","服务年限","ABD","根据《环境影响评价技术导则—地下水环境》（HJ 610—2016）规定，地下水环境影响预测时段应选取可能产生地下水污染的关键时段，至少包括污染发生后100d、1000d，服务年限或者能反映特征因子迁移规律的其他重要的时间节点。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]