[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886127":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886127,572,2,"多选题","建设项目的环境影响评价，根据其对环境影响的程度和范围，编制（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境影响建议书",false,{"key":16,"text":17,"correct":18},"B","环境影响报告表",true,{"key":20,"text":21,"correct":14},"C","环境影响评价书",{"key":23,"text":24,"correct":18},"D","环境影响报告书","BD","《建设项目环境影响评价技术导则—总纲》（HJ 2.1—2016）规定了建设项目环境影响评价的一般性原则、通用规定、工作程序、工作内容及相关要求，适用于需编制环境影响报告书和环境影响报告表的建设项目环境影响评价。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]