[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886125":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886125,572,2,"多选题","建设项目环境影响预测的方法有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","专业判断法",false,{"key":16,"text":17,"correct":18},"B","物理模型法",true,{"key":20,"text":21,"correct":18},"C","数学模式法",{"key":23,"text":24,"correct":18},"D","类比调查法","BCD","预测与评价方法主要有数学模式法、物理模型法、类比调查法等，由各环境要素或专题环境影响评价技术导则具体规定。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]