[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886124":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886124,572,2,"多选题","在进行环境影响评价时，正式工作阶段的主要工作有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","研究有关文件",false,{"key":16,"text":17,"correct":18},"B","进一步的工程分析和环境现状调查",true,{"key":20,"text":21,"correct":14},"C","筛选重点评价项目",{"key":23,"text":24,"correct":18},"D","进行环境影响预测和评价环境影响","BD","正式工作阶段的主要工作是做进一步的工程分析，进行充分的环境现状调查、监测并开展环境质量现状评价，之后进行各环境因素环境影响预测与评价以及各专题环境影响分析与评价。AC两项是环境影响评价第一阶段的工作内容。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]