[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886123":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886123,572,2,"多选题","环境影响评价的工作程序包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","调查分析和工作方案制定阶段",true,{"key":16,"text":17,"correct":14},"B","分析论证和预测评价阶段",{"key":19,"text":20,"correct":21},"C","环境影响报告书实施阶段",false,{"key":23,"text":24,"correct":14},"D","环境影响评价报告书（表）编制阶段","ABD","分析判定建设项目选址选线、规模、性质和工艺路线等与国家和地方有关环境保护法律法规、标准、政策、规范、相关规划、规划环境影响评价结论及审查意见的符合性，并与生态保护红线、环境质量底线、资源利用上线和环境准入负面清单进行对照，作为开展环境影响评价工作的前提和基础。环境影响评价工作一般分为三个阶段，即：①调查分析和工作方案制定阶段；②分析论证和预测评价阶段；③环境影响评价报告书（表）编制阶段。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]