[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886115":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},886115,572,2,"多选题","在进行环境影响评价时，环境影响报告编制阶段的主要工作有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","给出建设项目环境影响评价与结论",true,{"key":16,"text":17,"correct":14},"B","给出污染物排放清单",{"key":19,"text":20,"correct":14},"C","提出环境保护措施，进行技术经济论证",{"key":22,"text":23,"correct":24},"D","进一步的工程分析和环境现状调查",false,"ABC","在进行环境影响评价时，环境影响报告编制阶段的主要工作是：①提出环境保护措施，进行技术经济论证；②给出污染物排放清单；③给出建设项目环境影响评价与结论；④编制环境影响报告书（表）。D项是环境影响评价第二阶段的工作内容。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术导则与标准","建筑工程",0]