[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886077":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},886077,572,1,"单选题","根据《建设项目竣工环境保护验收技术规范—生态影响类》，建设项目竣工环境保护验收详细调查阶段的工作内容不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境质量和污染源监测",false,{"key":16,"text":17,"correct":18},"B","污染源和环境敏感目标调查",true,{"key":20,"text":21,"correct":14},"C","生态保护措施及其效果检查",{"key":23,"text":24,"correct":14},"D","环境保护措施和设施运行及其效果检查","初步调查阶段包括核查工程设计、建设变更情况及环境敏感目标变化情况。B项中环境敏感目标调查属于初步调查。详细调查阶段包括：①生态保护措施及效果检查；②环境保护措施和设施运行及效果检查；③环境质量和污染源监测；④公众意见调查。所以ACD三项正确。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]