[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886039":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},886039,572,1,"单选题","进行固体废物产生量核算时，对于生产工艺成熟的项目，应通过（ ）分析估算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","物料衡算法",true,{"key":16,"text":17,"correct":18},"B","类比法",false,{"key":20,"text":21,"correct":18},"C","产排污系数法",{"key":23,"text":24,"correct":18},"D","实测法","对于生产工艺成熟的项目，应通过物料衡算法分析估算危险废物产生量，必要时采用类比法、产排污系数法校正，并明确类比条件、提供类比资料；若无法按物料衡算法估算，可采用类比法估算，但应给出所类比项目的工程特征和产排污特征等类比条件；对于改、扩建项目可采用实测法统计核算危险废物产生量。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]