[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-886037":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},886037,572,1,"单选题","填埋场在服务期满后，需要提出填埋场封场、植被恢复的具体措施，并要求提出封场后（ ）的管理和监测方案。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","20年内",false,{"key":16,"text":17,"correct":14},"B","25年内",{"key":19,"text":20,"correct":21},"C","30年内",true,{"key":23,"text":24,"correct":14},"D","35年内","填埋场在建设期势必要永久占地和临时占地，植被将受到影响，可能造成生物资源或农业资源损失，甚至对生态环境敏感目标产生影响。而在服务期满后，需要提出填埋场封场、植被恢复的具体措施，并要求提出封场后30年内的管理和监测方案。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]