[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885943":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},885943,572,1,"单选题","根据《环境影响评价技术导则 总纲》，关于单项环境影响评价的工作等级，说法正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","各单项环境影响评价的工作等级均应相同",false,{"key":16,"text":17,"correct":14},"B","各单项环境影响评价的工作等级不能调级",{"key":19,"text":20,"correct":21},"C","对于单项环境影响评价工作等级均低于第三级的建设项目，可填写《建设项目环境影响报告表》",true,{"key":23,"text":24,"correct":14},"D","对于有任一单项环境影响评价工作等级低于第三级的建设项目，均可","对于单项影响评价的工作等级均低于第三级的建设项目，不需编制环境影响报告书，只需按国家颁发的《建设项目环境保护管理办法》填写《建设项目环境影响报告表》。对于建设项目中个别评价工作等级低于第三级的单项影响评价，可根据具体情况进行简单的叙述、分析或不作叙述、分析。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]