[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885941":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},885941,572,1,"单选题","根据《规划环境影响评价技术导则—总纲》，下列内容中，不属于跟踪评价方案一般内容的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","评价的时段",false,{"key":16,"text":17,"correct":14},"B","主要评价内容",{"key":19,"text":20,"correct":21},"C","规划方案比选",true,{"key":23,"text":24,"correct":14},"D","管理机构设置及其职责定位","根据《规划环境影响评价技术导则—总纲》，跟踪评价方案一般包括评价的时段、主要评价内容、资金来源、管理机构设置及其职责定位等。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]