[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885924":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},885924,572,1,"单选题","根据《规划环境影响评价技术导则—总纲》，对规划方案中具体建设项目提出的环境准入要求不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设项目规模",false,{"key":16,"text":17,"correct":14},"B","建设项目总量控制",{"key":19,"text":20,"correct":14},"C","建设项目选址或选线",{"key":22,"text":23,"correct":24},"D","建设项目污染防治措施",true,"如规划方案中包含有具体的建设项目，还应针对建设项目所属行业特点及其环境影响特征，提出建设项目环境影响评价的重点内容和基本要求，并依据本规划环境影响评价的主要评价结论提出相应的环境准入（包括选址或选线、规模、清洁生产水平、节能减排、总量控制和生态保护要求等）、污染防治措施建设和环境管理等要求。同时，在充分考虑规划编制时设定的某些资源、环境基础条件随区域发展发生变化的情况下，提出建设项目环境影响评价内容的具体简化建议。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]