[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885895":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},885895,572,1,"单选题","在环境风险评价的资料收集和准备中，主要收集建设项目的资料不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程资料",false,{"key":16,"text":17,"correct":14},"B","环境资料",{"key":19,"text":20,"correct":21},"C","风险资料",true,{"key":23,"text":24,"correct":14},"D","事故资料","主要收集建设项目的资料有：①工程资料；②环境资料；③事故资料，为进行物质风险识别和生产设施风险识别提供基础资料。环境资料主要应收集有关拟建项目附近居民分布及敏感目标方位、距离、重要水环境和生态保护资料。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]