[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},885866,572,1,"单选题","根据《环境影响评价技术导则—生态影响》，建设项目生态评价工作范围确定依据不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目与所在区域行政隶属的关系",true,{"key":16,"text":17,"correct":18},"B","建设项目与所在区域生物过程的关系",false,{"key":20,"text":21,"correct":18},"C","建设项目与所在区域气候过程的关系",{"key":23,"text":24,"correct":18},"D","建设项目与所在区域水文过程的关系","《环境影响评价技术导则—生态影响》（HJ 19—2011）中指出，生态影响评价工作范围应依据评价项目对生态因子的影响方式、影响程度和生态因子之间的相互影响和相互依存关系确定。可综合考虑评价项目与项目区的气候过程、水文过程、生物过程等生物地球化学循环过程的相互作用关系，以评价项目影响区域所涉及的完整气候单元、水文单元、生态单元、地理单元界限为参照边界。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]