[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885806":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},885806,572,1,"单选题","土壤环境影响评价不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","准备阶段",false,{"key":16,"text":17,"correct":14},"B","现状调查与评价阶段",{"key":19,"text":20,"correct":14},"C","结论阶段",{"key":22,"text":23,"correct":24},"D","对比分析阶段",true,"根据《环境影响评价技术导则—土壤环境（试行）》（HJ 964—2018），土壤环境影响评价工作可划分为准备阶段、现状调查与评价阶段、预测分析与评价阶段和结论阶段。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]