[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885804":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},885804,572,1,"单选题","土壤环境影响评价主要评价时期包括：建设项目建设期、（ ）和服务期满后。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","运营期",true,{"key":16,"text":17,"correct":18},"B","维护期",false,{"key":20,"text":21,"correct":18},"C","扩建期",{"key":23,"text":24,"correct":18},"D","改建期","根据《环境影响评价技术导则—土壤环境（试行）》（HJ 964—2018），土壤环境影响评价应对建设项目建设期、运营期和服务期满后（可根据项目情况选择）对土壤环境理化特性可能造成的影响进行分析、预测和评估，提出预防或者减轻不良影响的措施和对策，为建设项目土壤环境保护提供科学依据。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]