[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885627":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},885627,572,1,"单选题","地下水环境影响预测属于地下水环境影响评价工作的（ ）阶段。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","准备阶段",false,{"key":16,"text":17,"correct":14},"B","现状调查与评价阶段",{"key":19,"text":20,"correct":21},"C","影响预测与评价阶段",true,{"key":23,"text":24,"correct":14},"D","结论阶段","地下水环境影响评价工作可划分以下四个阶段：①准备阶段；②现状调查与评价阶段；③影响预测与评价阶段；④结论阶段。其中影响预测与评价阶段的主要内容是进行地下水环境影响预测，依据国家、地方有关地下水环境的法规及标准，评价建设项目对地下水环境可能造成的直接影响。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]