[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885583":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},885583,572,1,"单选题","《地表水环境质量标准》中规定的项目标准值，要求水样采集后自然沉降（ ），取上层非沉降部分按规定方法进行分析。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","30min",true,{"key":16,"text":17,"correct":18},"B","45min",false,{"key":20,"text":21,"correct":18},"C","60min",{"key":23,"text":24,"correct":18},"D","2h","在水质监测过程中，《地表水环境质量标准》（GB 3838—2002）规定的项目标准值，要求水样采集后自然沉降30min，取上层非沉降部分按规定方法进行分析；地表水水质监测的采样布点、监测频率应符合国家地表水环境监测技术规范的要求。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]