[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885538":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},885538,572,1,"单选题","地表水环境影响评价工作等级为二级的建设项目，其环境现状调查区内河流的面源污染严重，丰水期水质劣于枯水期。依据《环境影响评价技术导则—地表水环境》，一般情况下其水质现状调查的时期应包括（ ）。[2009年真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","丰水期",false,{"key":16,"text":17,"correct":18},"B","枯水期、丰水期",true,{"key":20,"text":21,"correct":14},"C","枯水期、平水期",{"key":23,"text":24,"correct":14},"D","枯水期、平水期、丰水期","根据现实行《环境影响评价技术导则—地表水环境》（HJ 2.3—2018）规定，调查时期与评价时期一致，评价时期有表确定，因此本题中水质现状调查的时期应包括枯水期、丰水期。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]