[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885530":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},885530,572,1,"单选题","一般情况下，水文调查与水文测量应在（ ）进行，必要时，其他时期可进行补充调查。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","丰水期",false,{"key":16,"text":17,"correct":18},"B","枯水期",true,{"key":20,"text":21,"correct":14},"C","丰水期与枯水期",{"key":23,"text":24,"correct":14},"D","平水期","水文测量和水质监测应尽量向有关部门收集现有资料，当资料不足时，需进行一定的水文调查（测量）与水质调查（监测），特别需要进行与水质调查同步的水文测量。一般情况，水文调查与水文测量在枯水期进行，必要时，其他时期（丰水期、平水期、冰封期等）可进行补充调查。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]