[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885449":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},885449,572,1,"单选题","当进行污染事故排放监测时，应按需要设置（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","采样时间和采样频次",true,{"key":16,"text":17,"correct":18},"B","采样标准和采样时间",false,{"key":20,"text":21,"correct":18},"C","采样地点和采样频次",{"key":23,"text":24,"correct":18},"D","采样标准和采样地点","根据《大气污染物综合排放标准》（GB 16297—1996）的规定，当进行污染事故排放监测时，应按需要设置采样时间和采样频次。建设项目环境保护设施竣工验收监测的采样时间和频次，按国家环境保护总局制定的建设项目环境保护设施竣工验收监测办法执行。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]