[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885365":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},885365,572,1,"单选题","根据《环境影响评价技术导则—大气环境》，如果符合可直接使用的气象台（站）有高空探空资料，对于大气环境一、二级评价项目，可酌情调查有关距该气象台（站）地面（ ）高度以下的风和气温资料。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1200m",false,{"key":16,"text":17,"correct":18},"B","1500m",true,{"key":20,"text":21,"correct":14},"C","1700m",{"key":23,"text":24,"correct":14},"D","2000m","观测资料的时次根据所调查常规高空气象探测站的实际探测时次确定，一般应至少调查每日1次（北京时间08点）的距地面1500m高度以下的高空气象探测资料。观测资料的常规调查项目包括：时间（年、月、日、时）、探空数据层数、每层的气压、高度、气温、风速、风向（以角度或按16个方位表示）",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]