[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885349":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},885349,572,1,"单选题","（2018年）根据《建设项目环境影响评价技术导则总纲》，下列情景中，属于建设项目生产运行阶段重点预测的情景是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","非正常工况和事故工况",false,{"key":16,"text":17,"correct":14},"B","正常工况和事故工况",{"key":19,"text":20,"correct":21},"C","正常工况和非正常工况",true,{"key":23,"text":24,"correct":14},"D","正常工况.非正常工况和事故工况","应重点预测建设项目生产运行阶段正常工况和非正常工况等情况的环境影响。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术导则与标准","建筑工程",0]