[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-885122":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},885122,571,1,"单选题","我国环境管理的“三同时”制度是指：",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目配套的环保设施必须与主体工程同时设计、同时施工、同时投产使用",true,{"key":16,"text":17,"correct":18},"B","建设项目配套的公用设施必须与主体工程同时设计、同时施工、同时投产使用",false,{"key":20,"text":21,"correct":18},"C","建设项目配套的基础设施必须与主体工程同时设计、同时施工、同时投产使用",{"key":23,"text":24,"correct":18},"D","建设项目配套的绿化设施必须与主体工程同时设计、同时施工、同时投产使用","提示 “三同时”制度是建设项目环境管理的一项基本制度，是我国以预防为主的环保政策的重要体现。即，建设项目中环境保护设施必须与主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":27,"category":28,"favorite":29},"注册环保工程师 - 专业基础","建筑工程",0]