[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-570-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},570,"注册环保工程师 - 公共基础","建筑工程",0,14,50,2930,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},882578,1,"单选题","下列关于经济效益和经济费用的表述中，正确的是：",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","经济效益只考虑项目的直接效益",false,{"key":24,"text":25,"correct":26},"B","项目对提高社会福利和社会经济所作的贡献都记为经济效益",true,{"key":28,"text":29,"correct":22},"C","计算经济费用效益指标采用企业设定的折现率",{"key":31,"text":32,"correct":22},"D","影子价格是项目投入物和产出物的市场平均价格","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},882579,"对建设项目进行经济费用效益分析所使用的影子价格的正确含义是：",[38,40,42,44],{"key":20,"text":39,"correct":22},"政府为保证国计民生为项目核定的指导价格",{"key":24,"text":41,"correct":22},"使项目产出品具有竞争力的价格",{"key":28,"text":43,"correct":22},"项目投入物和产出物的市场最低价格",{"key":31,"text":45,"correct":26},"反映项目投入物和产出物真实经济价值的价格",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},882580,"以下关于项目经济费用效益分析的说法中正确的是：",[50,52,54,56],{"key":20,"text":51,"correct":22},"经济费用效益分析应考虑沉没成本",{"key":24,"text":53,"correct":22},"经济费用和效益的识别不适用“有无对比”原则",{"key":28,"text":55,"correct":26},"识别经济费用效益时应剔出项目的转移支付",{"key":31,"text":57,"correct":22},"为了反映投入物和产出物真实经济价值，经济费用效益分析不能使用市场价格",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},882581,"交通运输部门拟修建一条公路，预计建设期为一年，建设期初投资为100 万元，建设后即投入使用，预计使用寿命为10年，每年将产生的效益为20万元，每年需投入保养费8000元。若社会折现率为10%，则该项目的效益费用比为：",[62,64,66,68],{"key":20,"text":63,"correct":26},"1. 07",{"key":24,"text":65,"correct":22},"1. 17",{"key":28,"text":67,"correct":22},"1. 85",{"key":31,"text":69,"correct":22},"1. 92",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},882582,"河外贸货物的投入或产出的影子价格应根据口岸价格计算，下列公式正确的是：",[74,76,78,80],{"key":20,"text":75,"correct":22},"A. 出口产出的影子价格(出厂价)=离岸价(FO B) X影子汇率+出口费用",{"key":24,"text":77,"correct":22},"B. 出口产出的影子价格(出厂价)=到岸价(CI F) X影子汇率-出口费用",{"key":28,"text":79,"correct":26},"进口投入的影子价格(到厂价)=到岸价(CIX影子汇率+进口费用",{"key":31,"text":81,"correct":22},"进口投入的影子价格(到厂价)=离岸价(FOX影子汇率-进口费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},882583,"某建设项目年设计生产能力为8万台，年固定成本为1200万元，产品单台售价为1000元，单台产品可变成本为600元，单台产品销售税金及附加为150元，则该项目的盈亏平衡点的产销量为：",[86,88,90,92],{"key":20,"text":87,"correct":26},"48000 台",{"key":24,"text":89,"correct":22},"12000 台",{"key":28,"text":91,"correct":22},"30000 台",{"key":31,"text":93,"correct":22},"21819 台",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},882584,"在单因素敏感分析图中，下列哪一项影响因素说明该因素越敏感？",[98,100,102,104],{"key":20,"text":99,"correct":22},"直线的斜率为负",{"key":24,"text":101,"correct":22},"直线的斜率为正",{"key":28,"text":103,"correct":26},"直线的斜率绝对值越大",{"key":31,"text":105,"correct":22},"直线的绝对值越小",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},882585,"盈亏平衡分析是一种特殊形式的临界点分析，它适用于财务评价，其计算应按项目投产后以下哪项计算？",[110,112,114,116],{"key":20,"text":111,"correct":26},"正常年份的销售收入和成本费用数据利润总额",{"key":24,"text":113,"correct":22},"计算期内的平均值",{"key":28,"text":115,"correct":22},"年产量",{"key":31,"text":117,"correct":22},"单位产品销售价格",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},882586,"成本可分为固定成本和可变成本，假设生产规模一定，以下说法中正确的是",[122,124,126,128],{"key":20,"text":123,"correct":22},"产量增加，但固定成本在单位产品中的成本不变",{"key":24,"text":125,"correct":26},"单位产品中固定成本部分随产量增加而减少",{"key":28,"text":127,"correct":22},"固定成本低于可变成本时才能盈利",{"key":31,"text":129,"correct":22},"固定成本与可变成本相等时利润为零",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},882587,"某吊车生产企业，以产量表示的盈亏平衡点为600台。预计今年的固定成本将增加20%，若其他条件不变，则盈亏平衡点将变为：",[134,136,138,140],{"key":20,"text":135,"correct":26},"720 台",{"key":24,"text":137,"correct":22},"600 台",{"key":28,"text":139,"correct":22},"500 台",{"key":31,"text":141,"correct":22},"480 台",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},882588,"某企业生产一种产品，年固定成本为1000万元，单位产品的可变成本为300元、售价为500元，则其盈亏平衡点的销售收入为：",[146,148,150,152],{"key":20,"text":147,"correct":22},"5万元",{"key":24,"text":149,"correct":22},"600万元",{"key":28,"text":151,"correct":22},"1500万元",{"key":31,"text":153,"correct":26},"2500万元",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},882589,"建设项目经济评价有一整套指标体系，敏感性分析可选定其中一个或几个主要指标进行分析，最基本的分析指标是：",[158,160,162,164],{"key":20,"text":159,"correct":22},"财务净现值",{"key":24,"text":161,"correct":26},"内部收益率",{"key":28,"text":163,"correct":22},"投资回收期",{"key":31,"text":165,"correct":22},"偿债备付率",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},882590,"关于盈亏平衡点的下列说法中，错误的是：",[170,172,174,176],{"key":20,"text":171,"correct":22},"盈亏平衡点是项目的盈利与亏损的转折点",{"key":24,"text":173,"correct":22},"盈亏平衡点上，销售(营业、服务)收入等于总成本费用",{"key":28,"text":175,"correct":26},"盈亏平衡点越低，表明项目抗风险能力越弱",{"key":31,"text":177,"correct":22},"盈亏平衡分析只用于财务分析",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},882591,"在进行互斥方案选优时，若备选方案的收益率基本相同，且难于估计时，比选计算应考虑采用：",[182,183,185,186],{"key":20,"text":161,"correct":22},{"key":24,"text":184,"correct":22},"净现值",{"key":28,"text":163,"correct":22},{"key":31,"text":187,"correct":26},"费用现值",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},882592,"采用净现值(NPV)、内部收益率(IRR)和差额内部收益率(ΔIRR)进行互斥方案比选，它们的评价结论是：",[192,194,196,198],{"key":20,"text":193,"correct":22},"NPV和ΔIRR总是不一致的",{"key":24,"text":195,"correct":22},"IRR和ΔIRR总是一致的",{"key":28,"text":197,"correct":26},"NPV和ΔIRR总是一致的",{"key":31,"text":199,"correct":22},"NPV、IRR和ΔIRR总是不一致的",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},882593,"两个初始投资相同、寿命期相同的投资方案，下列说法中正确的是：",[204,206,208,210],{"key":20,"text":205,"correct":22},"NPV1=NPV2，则IRR1= IRR2",{"key":24,"text":207,"correct":22},"NPV1>NPV2，则IRR1>IRR2",{"key":28,"text":209,"correct":22},"NPV1>NPV2，则IRR12",{"key":31,"text":211,"correct":26},"NPV1>NPV2≥0，则方案 1 较优",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},882594,"某项目有甲乙丙丁4个投资方案，寿命期都是8年，设定的折现率8%，(A\u002FP, 8%,8)=0. 1740，各方案各年的净现金流量如表所示，采用年值法应选用：",[216,218,220,222],{"key":20,"text":217,"correct":22},"甲方案",{"key":24,"text":219,"correct":22},"乙方案",{"key":28,"text":221,"correct":22},"丙方案",{"key":31,"text":223,"correct":26},"丁方案",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},882595,"已知甲、乙为两个寿命期相同的互斥项目，其中乙项目投资大于甲项目。通过测算得出甲、乙两项目的内部收益率分别为17%和14%，增量内部收益△IRR(乙—甲)= 13%，基准收益率为14%，以下说法中正确的是：",[228,230,232,234],{"key":20,"text":229,"correct":26},"应选择甲项目",{"key":24,"text":231,"correct":22},"应选择乙项目",{"key":28,"text":233,"correct":22},"应同时选择甲、乙两个项目",{"key":31,"text":235,"correct":22},"甲、乙两项目均不应选择",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},882596,"下列项目方案类型中，适于采用净现值法直接进行方案选优的是：",[240,242,244,246],{"key":20,"text":241,"correct":22},"寿命期相同的独立方案",{"key":24,"text":243,"correct":22},"寿命期不同的独立方案",{"key":28,"text":245,"correct":26},"寿命期相同的互斥方案",{"key":31,"text":247,"correct":22},"寿命期不同的互斥方案",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},882597,"在项目无资金约束、寿命不同、产出不同的条件下，方案经济比选只能采用:",[252,254,256,258],{"key":20,"text":253,"correct":22},"净现值比较法",{"key":24,"text":255,"correct":22},"差额投资内部收益率法",{"key":28,"text":257,"correct":26},"净年值法",{"key":31,"text":259,"correct":22},"费用年值法",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},882598,"以下关于改扩建项目财务分析的说法中正确的是：",[264,266,268,270],{"key":20,"text":265,"correct":22},"应以财务生存能力分析为主",{"key":24,"text":267,"correct":22},"应以项目清偿能力分析为主",{"key":28,"text":269,"correct":22},"应以企业层次为主进行财务分析",{"key":31,"text":271,"correct":26},"应遵循“有无对比”原刚",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},882599,"属宁改扩建项目经济评价中使用的五种数据之一的是:",[276,278,280,282],{"key":20,"text":277,"correct":22},"资产",{"key":24,"text":279,"correct":22},"资源",{"key":28,"text":281,"correct":22},"效益",{"key":31,"text":283,"correct":26},"增量",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},882600,"对于改扩建项目的经济评价，以下表述中正确的是：",[288,290,292,294],{"key":20,"text":289,"correct":22},"仅需要估算“有项目”、“无项目”、“增量”三种状态下的效益和费用",{"key":24,"text":291,"correct":22},"只对项目本身进行经济性评价，不考虑对既有企业的影响",{"key":28,"text":293,"correct":22},"财务分析一般只按项目一个层次进行财务分析",{"key":31,"text":295,"correct":26},"需要合理确定原有资产利用、停产损失和沉没成本",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},882601,"ABC分类法中，部件数量占60%~80%、成本占5%~10%的为:",[300,302,304,306],{"key":20,"text":301,"correct":22},"A类",{"key":24,"text":303,"correct":22},"B类",{"key":28,"text":305,"correct":26},"C类",{"key":31,"text":307,"correct":22},"以上都不对",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},882602,"下列可以提高产品价值的是：",[312,314,316,318],{"key":20,"text":313,"correct":22},"功能不变，提高成本",{"key":24,"text":315,"correct":22},"成本不变，降低功能",{"key":28,"text":317,"correct":26},"成本增加一些，功能有很大提高",{"key":31,"text":319,"correct":22},"功能很大降低，成本降低一些",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},882603,"价值工程的价值是：",[324,326,328,330],{"key":20,"text":325,"correct":22},"研究对象的使用价值",{"key":24,"text":327,"correct":22},"研究对象的交换价值",{"key":28,"text":329,"correct":22},"研究对象的使用和交换价值",{"key":31,"text":331,"correct":26},"研究对象所具有的功能与获得该功能的全部费用的比值",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},882604,"开展价值工程活动的目的是：",[336,338,340,342],{"key":20,"text":337,"correct":22},"思想方法的更新和技术管理",{"key":24,"text":339,"correct":22},"对功能和成本进行系统分析和不断创新",{"key":28,"text":341,"correct":26},"提高功能对成本的比值",{"key":31,"text":343,"correct":22},"多领域协作降低产品成本",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},882605,"价值工程的“价值(V)”对于产品来说，可以表示为V=F\u002F C，F指产品的功能，而C则是指：",[348,350,352,354],{"key":20,"text":349,"correct":22},"产品的制造成本",{"key":24,"text":351,"correct":26},"产品的寿命周期成本",{"key":28,"text":353,"correct":22},"产品的使用成本",{"key":31,"text":355,"correct":22},"产品的研发成本",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},882606,"已知某产品的零件甲的功能评分为5，成本为20元，该产品各零件功能积分之和为40，产品成本为100元，则零件甲的价值系数为：",[360,362,364,366],{"key":20,"text":361,"correct":22},"0. 2",{"key":24,"text":363,"correct":26},"0. 625",{"key":28,"text":365,"correct":22},"0. 8",{"key":31,"text":367,"correct":22},"1. 6",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},882607,"下面关于价值工程的论述中正确的是：",[372,374,376,378],{"key":20,"text":373,"correct":22},"价值工程中的价值是指成本与功能的比值",{"key":24,"text":375,"correct":22},"价值工程中的价值是指产品消耗的必要劳动时间",{"key":28,"text":377,"correct":26},"价值工程中的成本是指寿命周期成本，包括产品在寿命期内发生的全部费用",{"key":31,"text":379,"correct":22},"价值工程中的成本就是产品的生产成本，它随着产品功能的增加而提高",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},882608,"某项目由 A、 B、 C、D四个部分组成，当采用强制确定法进行价值工程对象选择时，它们的价值指数分别如下所示。其中不应作为价值工程分析对象的是：",[384,386,388,390],{"key":20,"text":385,"correct":22},"0.7559",{"key":24,"text":387,"correct":26},"1.0000",{"key":28,"text":389,"correct":22},"1. 2245",{"key":31,"text":391,"correct":22},"1. 5071",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},882609,"在对象选择中，通过对每个部件与其他各部件的功能重要程度进行逐一对比打分，相对重要的得1分，不重要的得0分，此方法称为：",[396,398,400,402],{"key":20,"text":397,"correct":22},"经验分析法",{"key":24,"text":399,"correct":22},"百分比法",{"key":28,"text":401,"correct":22},"ABC分析法",{"key":31,"text":403,"correct":26},"强制确定法",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},882610,"按照《中华人民共和国建筑法》的规定，下列叙述中正确的是：",[408,410,412,414],{"key":20,"text":409,"correct":22},"设计文件选用的建筑材料、建筑构配件和设备，不得注明其规格、型号",{"key":24,"text":411,"correct":26},"设计文件选用的建筑材料、建筑构配件和设备，不得指定生产厂、供应商",{"key":28,"text":413,"correct":22},"设计单位应按照建设单位提出的质量要求进行设计",{"key":31,"text":415,"correct":22},"设计单位对施工过程中发现的质量问题应当按照监理单位的要求进行改正",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},882611,"按照《中华人民共和国建筑法》规定，建筑单位申领施工许可证，应该具备的条件之一是：",[420,422,424,426],{"key":20,"text":421,"correct":22},"拆迁工作已经完成",{"key":24,"text":423,"correct":22},"已经确定监理企业",{"key":28,"text":425,"correct":26},"有保证工程质量和安全的具体措施",{"key":31,"text":427,"correct":22},"建设资金全部到位",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},882612,"建设单位在领取开工证之后，应当在几个月内开工？",[432,434,436,438],{"key":20,"text":433,"correct":26},"3",{"key":24,"text":435,"correct":22},"6",{"key":28,"text":437,"correct":22},"9",{"key":31,"text":439,"correct":22},"12",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},882613,"根据《建筑法》规定，某建设单位领取了施工许可证，下列情节中，可能不导致施工许可证废止的是:",[444,446,448,450],{"key":20,"text":445,"correct":22},"领取施工许可证之日起三个月内因故不能按期开工，也未申请延期",{"key":24,"text":447,"correct":26},"领取施工许可证之日起按期开工后又中止施工",{"key":28,"text":449,"correct":22},"向发证机关申请延期开工一次，延期之日起三个月内，因故仍不能按期开工， 也未申请延期",{"key":31,"text":451,"correct":22},"向发证机关申请延期开工两次，超过6个月因故不能按期开工，继续申请延期",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},882614,"某建设项目甲建设单位与乙施工单位签订施工总承包合同后，乙施工单位经甲建设单位认可，将打桩工程分包给丙专业承包单位，丙专业承包单位又将劳务作业分包给丁劳务单位，由于丙专业承包单位从业人员责任心不强，导致该打桩工程部分出现了质量缺陷，对于该质量缺陷的责任承担，以下说明正确的是：",[456,458,460,462],{"key":20,"text":457,"correct":26},"乙单位和丙单位承担连带责任",{"key":24,"text":459,"correct":22},"丙单位和丁单位承担连带责任",{"key":28,"text":461,"correct":22},"丙单位向甲单位承担全部责任",{"key":31,"text":463,"correct":22},"乙、丙、丁三单位共同承担责任",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},882615,"建筑工程幵工前，建设单位应当按照国家有关规定申请领取施工许可证，颁发施工许可证的单位应该是：",[468,470,472,474],{"key":20,"text":469,"correct":22},"县级以上人民政府建设行政主管部门",{"key":24,"text":471,"correct":22},"工程所在地县级以上人民政府建设工程监督部门",{"key":28,"text":473,"correct":22},"工程所在地省级以上人民政府建设行政主管部门",{"key":31,"text":475,"correct":26},"工程所在地县级以上人民政府建设行政主管部门",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},882616,"重点工程建设项目应当坚持：",[480,482,484,486],{"key":20,"text":481,"correct":26},"安全第一的原则",{"key":24,"text":483,"correct":22},"为保证工程质量不怕牺牲",{"key":28,"text":485,"correct":22},"确保进度不变的原则",{"key":31,"text":487,"correct":22},"投资不超过预算的原则",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},882617,"对本单位的安全生产工作全面负责的人员应当是：",[492,494,496,498],{"key":20,"text":493,"correct":26},"生产经营单位的主要负责人",{"key":24,"text":495,"correct":22},"主管安全生产工作的副手",{"key":28,"text":497,"correct":22},"项目经理",{"key":31,"text":499,"correct":22},"专职安全员",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},882618,"某施工单位一个有职工185人的三级施工资质的企业，根据《安全生产法》规定，该企业下列行为中合法的是：",[504,506,508,510],{"key":20,"text":505,"correct":22},"只配备兼职的安全生产管理人员",{"key":24,"text":507,"correct":22},"委托具有国家规定相关专业技术资格的工程技术人员提供安全生产管理服务，由其负责承担保证安全生产的责任",{"key":28,"text":509,"correct":22},"安全生产管理人员经企业考核后即任职",{"key":31,"text":511,"correct":26},"设置安全生产管理机构",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},882619,"根据《安全生产法》的规定，生产经营单位主要负责人对本单位的安全生产负总责，某生产经营单位的主要负责人对本单位安全生产工作的职责是：",[516,518,520,522],{"key":20,"text":517,"correct":26},"建立、健全本单位安全生产责任制",{"key":24,"text":519,"correct":22},"保证本单位安全生产投入的有效使用",{"key":28,"text":521,"correct":22},"及时报告生产安全事故",{"key":31,"text":523,"correct":22},"组织落实本单位安全生产规章制度和操作规程",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},882620,"根据《招标投标法》的规定，招标人和中标人按照招标文件和中标人的投标文件，订立书面合同的时间要求是:",[528,530,532,534],{"key":20,"text":529,"correct":22},"自中标通知书发出之日起15日内",{"key":24,"text":531,"correct":26},"自中标通知书发出之日起30日内",{"key":28,"text":533,"correct":22},"自中标单位收到中标通知书之日起15日内",{"key":31,"text":535,"correct":22},"自中标单位收到中标通知书之日起30日内",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},882621,"根据《中华人民共和国招标投标法》的规定，下列包括在招标公告中的是：",[540,542,544,546],{"key":20,"text":541,"correct":26},"招标项目的性质、数量",{"key":24,"text":543,"correct":22},"招标项目的技术要求",{"key":28,"text":545,"correct":22},"对投标人员资格的审查的标准",{"key":31,"text":547,"correct":22},"拟签订合同的主要条款",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},882622,"建设单位工程招标应具备下列条件： ①有与招标工程相适应的经济技术管理人员； ②必须是一个经济实体，注册资金不少于一百万元人民币； ③有编制招标文件的能力； ④有审查投标单位资质的能力； ⑤具有组织开标、评标、定标的能力。",[552,554,556,558],{"key":20,"text":553,"correct":22},"①②③④⑤",{"key":24,"text":555,"correct":22},"①②③④",{"key":28,"text":557,"correct":22},"①②④⑤",{"key":31,"text":559,"correct":26},"①③④⑤",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},882623,"下列属于《招标投标法》规定的招标方式是：",[564,566,568,570],{"key":20,"text":565,"correct":22},"公开招标和直接招标",{"key":24,"text":567,"correct":26},"公开招标和邀请招标",{"key":28,"text":569,"correct":22},"公开招标和协议招标",{"key":31,"text":571,"correct":22},"公开招标和公开招标",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},882624,"根据《招标投标法》的规定，某建设工程依法必须进行招标，招标人委托了招标代理机构办理招标事宜，招标代理机构的行为合法的是：",[576,578,580,582],{"key":20,"text":577,"correct":22},"编制投标文件和组织评标",{"key":24,"text":579,"correct":26},"在招标人委托的范围内办理招标事宜",{"key":28,"text":581,"correct":22},"遵守《招标投标法》关于投标人的规定",{"key":31,"text":583,"correct":22},"可以作为评标委员会成员参与评标",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},882625,"根据《中华人民共和国招标投标法》的规定，招标人对已发出的招标文件进行必要的澄清或修改的，应当以书面形式通知所有招标文件收受人，通知的时间应当在招标文件要求提交投标文件截止时间至少：",[588,590,592,594],{"key":20,"text":589,"correct":22},"20日前",{"key":24,"text":591,"correct":26},"15日前",{"key":28,"text":593,"correct":22},"7日前",{"key":31,"text":595,"correct":22},"5日前",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},882626,"按照《中华人民共和国合同法》的规定，招标人在招标时，招标公告属于合同订立过程中的：",[600,602,604,606],{"key":20,"text":601,"correct":22},"邀约",{"key":24,"text":603,"correct":22},"承诺",{"key":28,"text":605,"correct":26},"要约邀请",{"key":31,"text":607,"correct":22},"以上都不是",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":20,"analysis":33},882627,"撤销要约时，撤销要约的通知应当在受要约人发出承诺通知（）到达受要约人。",[612,614,616,618],{"key":20,"text":613,"correct":26},"之前",{"key":24,"text":615,"correct":22},"当日",{"key":28,"text":617,"correct":22},"后五天",{"key":31,"text":619,"correct":22},"后十日",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]